HomeMy WebLinkAboutResolution 028-2006 Resolution No. 28-06
STP-Urban System Priority List
WHEREAS, the City of Brookings has designated certain streets to be included in the STP-
Urban System of Streets as defined by the SDDOT; and
� WHEREAS, the SDDOT has designated certain funds,Federal and State to be used for
construction,reconstruction and major repair of the STP-Urban System Streets; and
WHEREAS,the City of Brookings has been requested to establish a priority list of projects to
be considered for funding by the SDDOT;
NOW,THEREFORE,the City of Brookings hereby resolves that the following projects be
considered in the order listed:
Priority Bid
No. Pro'ect Location Year Trne of Work Leneth (mi.) Cost
1. 22° Ave. from
6�' St. to US 14 By-Pass 2007 AC Overlay,Digouts, 1.0 $300,000
Pvmt. Markings
2 22"a Ave. from
l lth St. S. to 20�' St. S. 2007 Mill,AC Overlay, Pvmt. 1.0 $250,000
Markings
3. Bike Trail along I-29 to 34th
Ave., over I-29,parallel to 2008 Asphalt Bike Trail $608,950
22"a Ave. to SDSU
4. 34th Ave from Crrading, Curb &Gutter,
US 14 to Prince Drive 2009 &Asphalt Surfacing 0.7 $1,000,000
5. Medary Ave. S. from
20th St. S. to 32"d St. S. 2011 Grading&Asphalt Surfacing 0.7 $500,000
Passed and approved this 28�'day of March 2006.
CIT F O KINGS
C\tY OFe?
�m f•'��rvco,pAo��� �$teirnl�� Mayor
�� �•
� T;:�
.N
4�in�: 3 9 �
r,�e )
c�.�� � lL�'�/�
Shari hornes,Brookings ity Clerk