HomeMy WebLinkAboutResolution 004-2006 Resolution No. 04-06 A Resolution Authorizing Change Order No. 1 (CCO#1) For Swiftel Center Air Conditioning Project Tessier's Inc. BE IT RESOLVED by the City Council that the following change order be allowed for Swiftel Air Conditioning Project: Construction Change Order Number 1: Painting of new and existing supply air duct for a total increase of$7,905.00. Passed and approved this 10�`day of January 2006. CI RO KINGS Sc . unsterman, Mayor 2OOi��P',I�O s�: �qP �z �vl� o�. � 9 ornes, City Clerk Memo for Swiftei Center Air Conditioning Project Change Order No. 1 The Swiftel Center Air Conditioning Project was on May 17th. The successful bidder was Tessiers, Inc. with the following bid: Tessier's Inc. Base Bid $193,200.00 Alt. H1 $25,100.00 Alt. H2 $21,420.00 Alt. H3 $7,140.00 Total Base+H1+H3 $225,440.00 The project included the following work: • Base Bid: Provide 80-ton air-cooled condensing unit, coil, piping, ductwork modifications, and temperature control system. (This would provide air conditioning to the existing duct layout) • Alternate Bid#H1: Relocate supply ductwork and supports approximately 20 feet. (These are the long tubular ducts that run adjacent to the roof on the inside of the arena). • Alternate Bid #H3: Provide motor operated control dampers for the supply ductwork. (The dampers would be installed on the supply ductwork and wou/d allow "aiming"of the cooling or heating to befter contro/the air flow) The origina! budget was $250,000.00 and a summary of the total project costs are: $16547.52 engineering design $225440.00 contract to build air conditioning 7905.00 painting $249892.52 total cost The original plans did not include painting the new duct nor the existing supply ductwork as there was concerns about keeping the project costs down to meet the budget. During the course of the project, one section of the supply duct line was dropped and was subsequently replaced by the contractor. This change order will allow the existing duct, the new duct returns and the new supply duct to be painted. The price includes a deduct for the cost of having the contractor paint the dropped duct. The painting will be paid for out of the Swiftel 2006 Capital Improvement Budget.