HomeMy WebLinkAboutResolution 085-2008 RESOLUTION NO. 85-08
A RESOLUTION REVISING FEES
OF THE CITY OF BROOKINGS, SOUTH DAKOTA.
WHEREAS the fines, fees, and procedures pertaining to services of the City of
Brookings shall be revised and adopted annually,
AND WHEREAS the City of Brookings requires weed removal, the Parks service fees
shall be adopted,
AND WHEREAS street and sidewalk snow removal is required under Section 74-
212, Article 5 of Chapter 74, the Street Department service fees shall be adopted under
Section 74-213,
AND WHEREAS the Engineer Department building permit fees required under
service fees shall be adopted, under Section 22-35, Article II of Chapter 22 of the Code of
Ordinances of the City of Brookings shall be revised,
AND WHEREAS planning and zoning application fees required under Section 66-3 of
Chapter 66 of the Code of Ordinances of the City of Brookings shall be revised,
AND WHEREAS the Code Enforcement Ordinance 33-08 was adopted, the Code
Enforcement fees shall be adopted,
AND WHEREAS the Airport Board is recommending fees for land leases and fuel
flowage the fees shall be adopted,
AND WHEREAS the Code of Ordinances of the City of Brookings under Section 34-
4, Article I of Chapter 34, fees for services by the Fire Department shall be adopted,
BE IT RESOLVED that the fees be adopted as follows:
Parks, Recreation, & Forestry
Weed Control plus contractor cost $25.00
Mowing I n hour $60.00
each additional hour or fraction $35.00
each additional hour large area $50.00
Brookings Street Department
Sidewalk Snow Removal $100.00/Hr (I Hr Minimum)
--First Offense Plus Sales Tax
Sidewalk Snow Removal $150.00/Hr (1 Hr Minimum)
--Repeat Offense Plus Sales Tax
Sign Repairs Replacement Cost, Plus Labor, Sales Tax,
--Traffic Accidents and Excise Tax
--Vandalism
Street Repairs Replacement Cost for Materials
Brookings City Engineer's Department
Residential Building Permit Fees:
The base valuation to determine permit fees for residential buildings and additions are based on
a dollar per square foot schedule per the following. The bid price must be quoted for
renovations or remodels.
Dwellings: Single-family dwellings, duplexes, townhouses:
Finished habitable space per square foot $65.00
Finished basements per square foot $24.00
Unfinished space (basement and upper levels) per square foot $18.00
Attached garages per square foot $20.00
Detached garages per square foot $18.00
Building Permit Fee Schedule
Group R-3 and U Occupancies Only:
Total Valuation Fees
$1.00 - 1,200.00 $20.00
$10.00 for the first $500 plus $1.50 for each additional
$1,200.01 - 2,000.00 $100 or fraction thereof, to and including $2,000, for
valuations in excess of$1,100.
$2 000.01 - 25 000 00 $32.50 for the first $2,000 plus $6.00 for each additional
, , .
$1,000 or fraction thereof, to and including $25,000.
$1 70.50 for the first $25,000 plus $4.50 for each
$25,000.01 - 50,000.00 additional $1,000 or fraction thereof, to and including
$50,000.
$283.00 for the first $50,000 plus $3.00 for each
$50,000.01 - 100,000.00 additional $1,000 or fraction thereof, to and including
$100,000.
$100 00001 and up $433.00 for the first $100,000 plus $2.50 for each
, .
additional $1,000 or fraction thereof.
Commercial Building Permit Fees:
Commercial Building Permit Fee Schedule
Groups A, B, E, F, H, I, M, S, Group R Division I's and Division 2's (including Group
U's accessory to the R-I and R-2 occupancies):
Total Valuation Fees
$1 - 700.00 $20.00
For values in excess of$700.00, $15.00 for the first
$700.01 to 2,000.00 $500.00, plus $2.00 for each additional $100.00 or fraction
thereof, to and including $2,000.00
$2 000 01 to 25 000 $45.00 for the first $2,000 plus $9.00 for each additional
. ,, .00
$1,000 or fraction thereof, to and including $25,000.
$25 000.01 to 50 000.00 $252.00 for the first $25,000 plus $6.50 for each additional
, ,
$1,000 or fraction thereof, to and including $50,000.
$50 000 01 to 100 000 00 $414.50 for the first $50,000 plus $4.50 for each additional
. ,, .
$1,000 or fraction thereof, to and including $100,000.
$639.50 for the first $100,000 plus $3.50 for each
$100,000.01 to 500,000.00 additional $1,000 or fraction thereof, to and including
$500,000.00
$2,039.50 for the first $500,000 plus $3.00 for each
$500.000'01 to 1.000,000.00 additional $1,000 or fraction thereof, to and including
$1,000,000.00
�| and $].539.SO for the O�t $|.000,00O plus $�O8 for each
- '---'----- additional $1,000 or fraction thereof.
Other I ons and Fees:
Inspections outside normal business hours per hour �ninirnurnch�r�e
(minimum - '
��5'00
��onehour)
Inspection for which no fee is specifically indicated per hour (minimum $45.00
charge of 1/2 hour)
Re-inspection fees assessed under provisions ofSectonR|08 |RCand $45.00
108 IBC per hour
Driveway, demolition, window replacement and other minor $25.00
construction per permit
Inspection fees assessed for moving of house $50'00
.
Planning and Zoning
Change of Zone $230.00
Planned Development District $230'00
Final Development Plan $100'00
Major Amendment $230.00
Minor Amendment $75.00
Board of Adjustment $100.00
Preliminary Plats $150'00
Final Plats $100.00
Vacation $150.00
|-|FkSitm Plan $100.00
Conditional Use $175.00
Zoning & Use Registration Permit $ 50.00
Rental License
--per structure $15.00
--for each dwelling unit for building with 7 or fewer units $2.00
—fmr each dvve|lin� unit for bui|din�svvith8mrrnwreunits $|'OD
. n ' .0 , -n - fir - . - UUin•
Lease Building/in part or whole $15.00
Leased dwelling/7 units or less charge per unit within a building $2'00
Leased dwelling/8 units or more charge per unit within a building $1.00
Code Enforcement
Code Enforcement Investigation per hour (I hour minimum) $45'00
Industrial Lands
Crop Land Lease Based on Bid
(current lease: $\0S/acre crop, $40/acre hay land)
Airport Fees
Land Lease per square foot $.11
Fuel Flowage per gallon FBO: $0.06
per gallon Others: $0.06
Crop land Lease Based on Bid
(current lease: $72/acre crop, $40/acre hay land)
Brookings City Fire Department
Fire Protection Systems Fees
Fire Sprinkler Systems $75.00 plus $.45 per sprinkler head
Retrofitted Fire Sprinkler Systems $75.00 plus $.45 per sprinkler head
Kitchen Hood Extinguishing Systems $90.00
Kitchen Hood Extinguishing System Modification $45.00
Clean Agent or other Total Flooding System per square
foot of covered area $.20
$75.00 + $.45 each initiation &
Fire Alarm Systems
signaling device
$37.50 + $.45 each initiation &
Fire Alarm System Modifications
signaling device
$0.00 First Call
False Fire Alarm Calls when trucks roll $50.00 Second Call
$100.00 Third Call
Flammable & Combustible Liquids
Flammable & Combustible Liquids $90.00
Flammable & Combustible Liquids Modifications $45.00
Site Plan Review
Site Plan Review per hour (one hour minimum) $45.00
Inspections outside of normal business hours per hour
(two hour minimum) $45.00
Re-inspection per hour (one hour minimum) $45.00
Passed and approved on this 14th day of October, 2008.
CITY OF BROOKINGS
401
runsterman, Mayor
_.,-;rc.TT`y`2.0',,`'‘,„
,iro.b
r
,11
::, ,.,. 61;t1
t:o • /vv.'
itik,izaiiir ALL-4
an Thornes, City Clerk