Loading...
HomeMy WebLinkAboutResolution 065-2013 Resolution No. 65-13 A Resolution Authorizing Change Order No. 6 for Dakota Nature Park Nature Center-Clark Drew Construction, Inc. Be It Resolved by the City Council that the following change order be allowed for Resolution 65- 13 Dakota Nature Park Nature Center: cost to furnish all material and labor to reconfigure the duct work serving rooms 102/111 as detailed in Request for Proposal#6. Baete- Forseth Materials: No cost change as the dampers were made prior to the RP being generated. Electric Construction Materials: Smoke Detector= ($34.00) Labor: 5 man hours @ $50/hr= ($248.00) Subtotal = ($282.00) Clark Drew Construction, Inc. Materials: Sheetrock lid @ 103: 768 sf @ $.28/sf= ($215.04) Access panels: 2 panels @ $79.50 ea = ($159.00) Labor: Sheetrock: 768 sf @ $.38/sf= ($291.84) Access panels: 2 panels @ $31.00 ea = ($62.00) Subtotal = ($727.88) Clark Drew Construction, Inc. Subtotal = ($1,009.88) SD Excise Tax @ 2%= ($20.20) Bonding 1.2% = ($12.36) Lump Sum Total = ($1,042.44) There will be a total deduction of$1,042.44. Contract history: $1,198,700.00 original contract sum $9,138.16.02 added from previous change orders $1,206,795.72 new contract amount after change order No. 6 Passed and approved this 11th day of June, 2013. CITY OF BROOKINGS y�N;NGOb, h / (L1212,4 r' % -A--A Tim Reed, Mayor 2 , Sha nes, City Clerk