HomeMy WebLinkAboutResolution 065-2013 Resolution No. 65-13
A Resolution Authorizing Change Order No. 6 for
Dakota Nature Park Nature Center-Clark Drew Construction, Inc.
Be It Resolved by the City Council that the following change order be allowed for Resolution 65-
13 Dakota Nature Park Nature Center: cost to furnish all material and labor to reconfigure the
duct work serving rooms 102/111 as detailed in Request for Proposal#6.
Baete- Forseth
Materials: No cost change as the dampers were made prior to the RP being
generated.
Electric Construction
Materials: Smoke Detector= ($34.00)
Labor: 5 man hours @ $50/hr= ($248.00)
Subtotal = ($282.00)
Clark Drew Construction, Inc.
Materials: Sheetrock lid @ 103: 768 sf @ $.28/sf= ($215.04)
Access panels: 2 panels @ $79.50 ea = ($159.00)
Labor: Sheetrock: 768 sf @ $.38/sf= ($291.84)
Access panels: 2 panels @ $31.00 ea = ($62.00)
Subtotal = ($727.88)
Clark Drew Construction, Inc.
Subtotal = ($1,009.88)
SD Excise Tax @ 2%= ($20.20)
Bonding 1.2% = ($12.36)
Lump Sum Total = ($1,042.44)
There will be a total deduction of$1,042.44.
Contract history:
$1,198,700.00 original contract sum
$9,138.16.02 added from previous change orders
$1,206,795.72 new contract amount after change order No. 6
Passed and approved this 11th day of June, 2013.
CITY OF BROOKINGS
y�N;NGOb, h / (L1212,4
r' % -A--A Tim Reed, Mayor
2 ,
Sha nes, City Clerk