Loading...
HomeMy WebLinkAboutResolution 016-2013 Resolution No. 16-13 A Resolution Authorizing Change Order No. 2 for Dakota Nature Park— Nature Center Clark Drew Construction, Inc. Be It Resolved by the City Council that the following change order be allowed for the Dakota Nature Park—Nature Center: Construction Change Order Number 2. TE Underground Materials: Reducing 6" pipe to 4" = ($1,740.00) Reduce 6" tapping valve = ($153.40) Eliminating 6" material = ($1,662.66) Add: 8" valve, pipe and plug = $3,890.35 Labor: Reducing 6"to 4" = ($1,740.00) Live tap fee for 8" = $910.00 Subtotal: ($495.71) Clark Drew Construction, Inc. Subtotal = $495.71 SD Excise Tax @ 2%=$9.91 Bonding 1.2% =$6.07 Lump Sum Total =$511.69 There will be a total deduction of$511.69. Contract history: $1,198,700.00 original contract sum $1,191,990.00 after change order No. 1 $1,191,478.31 new contract amount after change order No. 2 Passed and approved this 12th day of February, 2013. CITY OF BROOKINGS 0 /- ./AVVkWitl Tim Reed,Mayor i 4149 'C Shari Thornes, City Clerk