HomeMy WebLinkAboutResolution 016-2013 Resolution No. 16-13
A Resolution Authorizing Change Order No. 2 for
Dakota Nature Park— Nature Center
Clark Drew Construction, Inc.
Be It Resolved by the City Council that the following change order be allowed for the Dakota
Nature Park—Nature Center:
Construction Change Order Number 2.
TE Underground
Materials: Reducing 6" pipe to 4" = ($1,740.00)
Reduce 6" tapping valve = ($153.40)
Eliminating 6" material = ($1,662.66)
Add: 8" valve, pipe and plug = $3,890.35
Labor: Reducing 6"to 4" = ($1,740.00)
Live tap fee for 8" = $910.00
Subtotal: ($495.71)
Clark Drew Construction, Inc.
Subtotal = $495.71
SD Excise Tax @ 2%=$9.91
Bonding 1.2% =$6.07
Lump Sum Total =$511.69
There will be a total deduction of$511.69.
Contract history:
$1,198,700.00 original contract sum
$1,191,990.00 after change order No. 1
$1,191,478.31 new contract amount after change order No. 2
Passed and approved this 12th day of February, 2013.
CITY OF BROOKINGS
0
/- ./AVVkWitl Tim Reed,Mayor
i 4149 'C
Shari Thornes, City Clerk