HomeMy WebLinkAboutRes. 19-031Revised Resolution 19-031
Bridge Reinspection Program Resolution
for use with SDDOT Retainer Contracts
Whereas, Title 23, Section 151, United States Code and Title 23, Part 650, Subpart C,
Code of Federal Regulations, requires initial inspection of all bridges and reinspection at
intervals not to exceed two years with the exception of reinforced concrete box culverts
that meet specific criteria. These culverts are reinspected at intervals not to exceed four
years.
Therefore, the City of Brookings is desirous of participating in the Bridge Inspection
Program using Bridge Replacement Funds.
Therefore, Be It Further Resolved, that the City of Brookings requests SDDOT to hire
Civil Design Inc. for the inspection work. SDDOT will secure Federal approvals, make
payments to the Consulting Engineer for inspection services rendered, and bill the City
for 20% of the cost. The City of Brookings will be responsible for the required 20%
matching funds.
This resolution will revise Resolution 19-031 which was adopted on March 26, 2019.
Passed and approved this 23rd day of April, 2019.
CITY OF BROOKINGS
Keith W. Corbett, Mayor
ATTEST:
foster, Acting City Clerk