HomeMy WebLinkAboutResolution 70-1991 RESOLUTION NO. 70-91 AUTHORIZING CHANGE ORDER NO. 1 FOR MUNICIPAL AIRPORT PROJECT A.I.P. 3-46-0005-09 BE IT RESOLVED By the City Commission that the following order be allowed for the Airport Obstruction Removal Project No. 3-46-0005-09. Bowes Construction Inc. Contract $ 686,660.49 Add, Change Order No. 1 3, 100. 00 New Contract Price $ 689,760.49 Approval of this Change Order is contingent upon concurrence by SDDOT and FAA. d and approved this 10th day of September, 1991. r�f B �ti T: �'pp� , ( r MAR 9 � , . �0 1883 0 �o�� �o� � N / Finance Officer . �� . CHANGE ORDER N0. 1 STATE OF SOUTH DAKOTA FEDE.�.4L AID PROJECT N0. AIP No. 3-46-0005-09 NAME OF AIRPORT BROOKINGS MUNICIPAL LOC�TION BROOKINGS, S.D. CONTR.ACTOR BOWES CONST. , INC. SCHEDIILE Na. BASE BID TO LYLE BOWES, PRESIDENT CONTR�C:OR: You are here�y ordered to make the following change in the plaas aad/or specif ications for the above designated project. 1. Description of change to be made: See attachment. 2. Reason for ordering chaage: See attachment. 3. Settlement �or the cost of the above change is to be made as follows: Increase to Contract amount of $3,100.00 This Change Order (increases) or (decreases) the coatract time by 0 working days. . 4. Summary o= Costs: Net (increase) ¢t/,�Q��]t���¢) of this Change Order $ '3.100.00 _ Total �iacrease) or (decrease) of aIl previous Change Orders $ 0.00 Total (iacrease) bf/�(Qkt�t�E���� of all Change Orders to date $ 3,100.00 Total Estiaated Contract Costs $ 698,760.49 NOTE• This ord �is not effe ive until signed by the SDDOT. Agreed to by: % . / GZ� Y 9 "�d 19y� � Sooasor's Author zed Rep. itle Date Agreed to by: �/ 9-k.�-�--� /1��a , y -� 19 �'� Con actor's Authorized Rep. Title Date Approved by:�%��i'� ��%G''�� ,g- �i 19,9� Trans tioa Program Eagineer • / _-y ,. 7 Approved by: � - � �T19� F �.irports Engineer Increase - Decrease -- Strike out the oae which does not apply. �lr�/r�k�t�ie�*�r*��t�t*�r�k�t�C�k***�k*�rint�k�t**�t*�t4nr�*�tie*�te�ht��e�r�r (Prepare and attach aay additional special provisions, plans or sketches required for ext:a or additional wvrk not thoroughly or satis=actorily stipulated or set forth by the coastruction plans and specifications) . chorder Page 1 / • � r , ATTACHMENT TO CHANGE ORDER N0. 1 MUNICIPAL AIRPORT IMPROVEMENTS OBSTRUCTION REMOVAL AIP N0. 3-46-0005-09 BROOKINGS, SOiITH DAKOTA The specifications for the project do not require that stumps be removed when clearing trees. As part of the City's negotiations with John Moriarty for an aviation easement, it was agreed to grind or remove tree stumps on his property and to cover the removal area with black dirt. The area involved is a triangular parcel at the southwest corn�r of the road intersecti�n at the northwest corner of the airport. There are approximately 30 large diameter (over 18") trees and around 20 small trees. This change order provides for the grinding or removing of tree stumps and covering the stumplocations with black dirt. The additional .cost for the change order work shall be a lump sum amount of $3,100.00.