Loading...
HomeMy WebLinkAboutResolution 54-1992 , - , RESOLUTION N0. 54-92 RESOLUTIOH OF HECESSITY FOR STREET AHD ALLEY ASSESSMENT PROJECT 92-09STA BE IT RESOLVED by the Board of Commissioners of the City of Brookings, South Dakota, as follows: The Board of Commiseionere of the City hereby declares the necessity of paving with a bituminous wearing surface on a cruehed gravel base couree on an alley of the City se follors: Paving the alley between Hinth Street and Harvey Dunn Street from Eighth Avenue to Ninth Avenue to a width of eighteen feet. The Board of Commissionere of the City hereby declares the necessity of construction of the minor etreets of the City as follovs: Grading, curb and gutter, inetallation of aater and seMer mains, seWer and water service lines and gravel base course in minor streets for a total street width of thirty one (31 ) feet on the minor streets listed below. a. PARKWAY BOULEVARD from Yosemite Lane west to its terminoue b. CA1?DIHAL DRIVE from Hunters Bidge Road to the north 462' c. DEER PASS in its entirety 1. The general nature of the improvement is above set forth and reference for details is hereby made to the draNings and specifications prepared by the City Engineer and on file r►ith the City Finance Officer. 2. The material to be used is concrete for curb and gutter and the following materials for gravelling of the streets: A six inch (6" ) crushed gravel base course for the trrenty six foot (26' ) vide minor streets. The material to be used for the alley is three inch bituminous mat on a six inch crushed gravel base course. 3. The estimated cost per linear foot of alley for paving for an eighteen foot wide alley is 520. 00. Each property ovner shall pay for one-half of the alley width over the Width of his property. The improvement is substantially uniform. The estimated cost of curb and gutter is 89. 00 per linear foot of curb and gutter or 518. 00 per linear foot of street, The estimated cost per linear foot of streets for gravelling pith a six (6) inch crushed gravel base course to be gravelled to a width of 31 feet back to back of curb is 816. 00 or 58. 00 per side of street. The estimated cost of a Water main is 812. 00 per lineal foot of the main. The estimated cost of a sewer main is 818. 00 per lineal foot of main. 4. A description of classes of lots to be assessed is as follors: All assessable lots and tracts of land lying contiguous to the streets and alley hereinabove described. 5. The method of apportionment of benefits is as follows: The cost thereof to be assessed against all assessable lots and tracts of land according to the benefits determined by the governing body to accrue to all such lots and tracta from the construction of the improvement. Passed and approved this 30th day of June, 1992. �O O'�/ � � � �� , � � N ` MAR.9 t..,- o� lgg;{ o Mayor � . -- - � - 0 Finance Officer