HomeMy WebLinkAboutResolution 102-1995 � RESOLUTION NO. 102-95 AUTHORIZING FINAL CHANGE ORDER(CCO#1 FINAL)FOR STREET ASSESSMENT PROJECT NO. 95-02STA STREET ASSESSMENT PROJECT (BOWES CONSTRUCTION) BE IT RESOLVED by the City Commission that the following change order be allowed for the Street Assessment Project 95-02STA. Construction Change Order Number 1 Final Adjust estimated quantities to "as built" quantities for a total increase of$12,655.13. Passed and approved this Sth day of December, 1995. //' � o�eaooKiN� ,� ORQORAIE�•.,s Mayor �MPK•9 �� 3 :,o s� Finance Oi�icer , 95-02STA MEDARY AVENUE SOUTH BOWES CONSTRUCTION NOVEMBER 16, 1595 FINAL CHANGE ORDER BOWES TOTAL FINAL FINAL CHANGE ITEM WORK OR MATERZAL UNITS PLAN UNIT BID INSTALLED INSTALLED ORDER NO. QUANTITY PRICE COST QUANTITY COST COST 1. UNCLASSIFZED EXCAVATION CU.YD. 850 4.40 3740.00 850.00 3740.00 0.00 2. INSTALL 30" CURB & GUTTER LN.FT. 700 12.15 8505.00 698.00 8480.70 -24.30 3. INSTALL 8" P.C.C. VALLEY/FILL SQ.FT. 900 3.60 3240.00 951.10 3423.96 183.96 4. CRUSHED GRAVEL BASE COURSE TON 650 6.00 3900.00 902.34 5414.04 1514.04 - 5. ASPHALT BASE COURSE TON 200 30.00 6000.00 152.67 4580.10 -1419.90 6. ASPHALT SURFACE COURSE TON 120 38.00 4560.00 151.12 5742.56 1182.56 � 7. ASPHALT CEMENT TON 21 155.00 3255.00 22.9139 3551.65 296.65 S. ADJUST MANHOLE EACH 4 200.00 800.00 2.00 400.00 -400.00 9. ADJUST WATER VALVE EACH 3 120.00 360.00 1.00 120.00 -240.00 10. MISCELLANEOUS CONDITIONS L.SUM 1 3500.00 3500.00 1.00 3500.00 0.00 11. DEWATERING L.SUM 1 2750.00 2750.00 1.00 2750.00 0.00 12. SELECT FILL TOM 777 7.00 5439.00 2364.62 16552.34 11113.34 � 13. BASE (1 1/2" ROCK) TON 70 15.20 1064.00 0.00 0.00 -1064.00 14. BEDDING (PEAROCK) TON 148 7.00 1036.00 183.44 1284.08 248.08 15. MANHOLE .A-1 EACH 1 2800.00 2800.00 1.00 2800.00 0.00 16. 8" SEWER MAIN LN.FT. 69 19.40 1338.60 67.00 1299.80 -38.80 17. 8"X8"X4" IN-LINc� WYE EACH 1 74.00 74.00 1.00 74.00 0.00 18. 8" WATER MAIN LN.FT. 478 17.00 8126.00 476.00 8092.00 -34.00 19. 6" WATER MAIN LN.FT. 52 14.50 754.00 52.00 754.00 0.00 20. 8"X8" CROSS EACH 1 310.00 310.00 1.00 310.00 0.00 21. 8"VP1,VE & VALVE BOX EACH 2 110.00 220.00 2.00 220.00 0.00 22. 6" VALVE & VALVE BOX EACH 1 110.00 110.00 1.00 110.00 0.00 23. 8"X6" REDUCER EACH 2 187.00 374.00 2.00 374.00 0.00 24. HYDRANT (CITY FURNISHED) EACH 1 500.00 500.00 1.00 500.00 0.00 25. 8" PLUG & THRUST BLOCK EACH 1 171.00 171.00 1.00 171.00 0.00 26. 6" SLEEVE EACH 1 513.00 513.00 1.00 513.00 0.00 27. SEEDING EACH 1 910.00 910.00 0.00 0.00 -910.00 EXTRA: SUPAC FABRIC SQ.YD. 0.00 1.25 0.00 1798.00 2247.50 2247.50 $64,349.60 $77,004.73 $12,655.13 . . � CHANGE ORDER - (Instructions on reverse side) No. � PROJEC"I' .....��-Q�.$�A....................... DATE OF ISSUANCE ...1.1,/,z 1,19,�.............. EFFECfIVE DATE ....J.l,/.2119.5......................... OWNER .......�7,�,y..s?�..�.►:s4A�C��9s............................................................................. OWNER's Contract No. ..:......:. ......................... CONTRACTOR ..�qW�$..Gsanstzu��.ion ENGINEER ...�i.t�y..�ng�n��r......................... You are directed to make the following changes in the Contract Documents. " Description: Increase of $12,655. 13 to final out the project ' Reason for Change Order: Adjust estimated quantities to as-built quantities Attachments: (List documents supporting change) CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES: Original Contract Price Original Contract'I'imes Substantial Completion: September 1 , 1995 ��4, 3 4 9 6 0 Ready for final payment: davs or data Net changes from previous Change Orders No._to No._ Net change from previous Change Orders No._to No._ S -0- � U dars Contract Price prior to this Change Order Contract Times prior to this Change Order Substantial Completion: SQ�teIilbe2' 1 . 1 995 a 6 4 �4 9 6 0 Ready for final payment: days or dates Net Increase�3esrsase;of this Change Order Net Increas�ss)of this Change Order � 12,655. 13 ___ 18.5 a�Ys Contract Price with all approved Change Orcler� Contract Times with all approved Change Orders SubstantialCompletion: (lc�tnhr�r 73..r 1995 a 7 7 0 0 4 7 3 Ready for final paymenr. Nov her 1 7 R 1 9 9 5 da�s or dates RECOMMENDED: APPROVED: ACCEPTED: By; �'� By: By;�"Tr�I,Y'/�� — ,L)J neer(Au rize Signatu ► Owner(Autlrorized Siana�we) Contractar(Authorized Sipnturc) '` '� Date: ���27—9 J� I)al�: Date: — o[ EJCDC No. 1910-8-B (1990 Edition) Prepared by the Engineers Joint Contract Docurf^nts Committee and endorsed by The Associated General Contractors of America.