HomeMy WebLinkAboutResolution 107-1995 � � ' RESOLUTION NO. 107-95 AUTHORIZING FINAL CHANGE ORDER(CCO#3 FINAL)FOR RAILROAD SPUR PROJECT NO. 95-03IND (BOWES CONSTRUCTION) BE IT RESOLVED by the City Commission that the following change order be allowed for the Railroad Spur Project 95-03IND. Construction Change Order Number 3 Final Adjust estimated quantities to "as built" quantities for a total increase of$11,073.11. AND BE IT FURTHER RESOLVED that the Brookings City Commission hereby approves and accepts Project 95-03IND Railroad Spur for Rainbow Industrial Park. Passed and approved this 12th day of December, 1995. �t Mayor T: �F BROOk/ ��1� �ptIPORA�f �� V s�;t 0 MAR.9 = �: ?� � — �ti� ' t Fin e Officer { i' F-•. � . FORr'�!� 9 - . C��ANGE O�►�DER �.. Order No. 0 0 3 Date 1 1/21/95 �_. Agreement Date 0 4/18/9 5 _ NAME OF PROJECT 95-03IND Railroad__Spur for Rainbow__� (CDBG 9494-504) OWNER_ (_i t-� c�f Arc�oki nq�� Sn CONTRACTOR Bowes Construction, Inc. Tf�FOLLOWIlIG CHANGES ARE HEREBY MADE TO THE CONTRACT DOCUMENTS Justification: (See Addendum #3 for breakdown of charges) Change to CONTRACT PRICE: Original COI�'TR4CT PRICE: $ 19 2.0 6 9_0 0 � Current CONTRACT PRICE ac�justed by previous CHANGE ORDEft$ 199.313_00 �e COI�"TRACT PRICE due to this CHANGE OR.DER will be(increased/�by 11 �073_ 11 The new CONTRACT PRICE including this CHANGE ORDER will be$ 210,3 8 6_ 11 Change to CONTRACT TIlV� Increase by 13 working days • The CONTRACT TIlV� will be (increased/��by i� �exking days. The date for completion of all work will be August 18. 1995 (date). APPR.OVALS REQUIRED To be effective,this Order must be approved by the appropriate state or Federal agencies if it changes the scope or objective of the PROJECT,or as may otherwise be required by the SUPPLEMENTAL GENER.AL CONDI'I'IONS. � Requested by � ' . R�ecommended by � Cit En ineer � Ordered by__ Not A,p8licable '� Accepted by _���'1�����T���� ,� Bow s _on� r � i an, Tn�_ Agency Approval(where applicable) . Mavor C�-1 ' _ . . . ' . . . . . . �Y,_. .. �_ ' . . � . .•'. . . � ' . .. . . . . . ' 95-03IND INDUSTRIAL pROJECT RAILROAD SPUR NOVEMBER 21, 1995 PAY SSTIXATS #5 (FZN1lL) BOWES CONSTRUCTION ORIGINAL SOWES HOWES CHANGE CHANGB CHANGE FINAL TOTAy IT� PLAN UNIT BID ORDBR #1 ORDER #2 ORDSR #3 INSTALLBD FINAL NO. WORR OR MATERIAL IINITS QUANTITY COST COST QOANTZTY QUANTITY QIIANTITY QIIANTZTY COST 1. FURNiSB & INSTALL SPUR RAILROAD TRACR LN.FT. 700 69.50 48650.00 700.00 700.00 795.00 795.00 55252.50 2. FURNZSH & INSTALL 6" CONCRETE SLAB SQ.FT. 10200 3.15 32130.00 10200.00 10200.00 10017.00 10017.00 31553.55 3. CRUSF�D GRAVEL SASE COURSE TON 2000 6.00 12000.00 2000.00 5000.00 6727.37 6727.37 40364.22 4. ASPHALT BASH COURSE TON 677 32.00 21664.00 6�7.00 677.00 554.60 554.60 17'147.20 5. ASPHALT SVRFACE COURSE TON 406 40.00 16240.00 406.00 406.00 389.42 389.42 15576.80 6. ASPHALT CEI�NT TON 70 180.00 12600.00 0.00 0.00 0.00 0.00 0.00 7. FURNISH & INSTALL 36" RCP CLASS 2II LN.FT. 520 88.00 45760.00 420.00 420.00 420.00 420.00 36960.00 8. FURNZSS & INSTALL STORM SEWER EACS 1 3025.00 3025.00 1.00 1.00 1.00 1.00 3025.00 CONNECTING STRUCTURE , 9. FURNZSH & INSTALL 30" LINED LN.FT, 0 106.00 0.00 100.00 100.00 100.00 100.00 10600.00 CONCRBTE PIPE ' 10. FORNISH & INSTALL ROBSER EACH 0 22.00 0.00 2.00 2.00 2.00 2.00 44.00 GASRETED JOINTS 11. BYTRA: BALLAST AROUND DRAIN TILB TON 0 15.60 0.00 0.00 0.00 48.90 48.90 762.84 C.O. #1: CRBDIT FOR REROOTING OF SANITARY -1500.00 SEWER � • T�T�' $192,069.00 S210,386.11 PREVIOUS PAYMENTS: 181 825.87 . TINAL PAYMENT • � ssa,s6o.2a P71Y ESTIMATE #lt $51444.00 PAY ESTIMATS #2s $46969.54 PAY ESTIMATB �3t $58016.11 PAY ESTIMATB #4: $25396.22 ` FINAL PAY ESTIMATEs $28560.24 ' . � : t. . . 95-031ND Raiiroad Spur (CDBG 9494504) Addendum to Change Order #3 The following changes to the contract for the above referenced � project are to improve the subbase under the railroad spur and to adJust the price of the sanitary sewer. 1. item �1 Furnish & Install Spur Railroad Track Add 95 linear feet of spur Raiiroad Track at 569.50 per lineal foot = +S6,602.50 EXpI. The additional track was to extend the spur to the new switch location. � 2. Item #2 Furnish & Instali 6" Concrete Slab Delete 183 square feet of 6" Concrete Siab at $3.15 per square foot = -$576.45 EXpI. Adjust plan quantity to as-built quantity. 3. Item#3 Crushed Gravel Base Course Add 1727.37 tons of Crushed Gravel Base Course at 56.00 per ton = +510,364.22 Expl. , The additionai crushed gravel base course is to replace unsatisfactory subbase material encountered in the raiiroad . crossing through the ditch and surrounding areas. 4. item �4 Asphalt Base Course Delete 122.4 tons of asphalt base course at S32.00 per ton = -53,916.80 EX I. p Adjust plan quantity to as-built quantity. 5. Item �5 Asphalt Surface Course Delete 16.58 tons of asphalt surface , course at S40.00 per ton = -5663.20 ' Expl. Adjust plan quantity to as-built quantity. � . ` '� - 6. Add Item �11 Ballast around drain tlie Add 15.60 tons of baliast at � one lump sum of = +5762.84 Expl. Extra ballast was needed around the drain tile which was extended from the end of the spur to the property line. This was not inciuded on the plans. 7. LUMP SUM DEDUCTION Deduct the foilowing lump sum from the project since the Brookings Muntclpal Utilittes dlverted the sewage flow while the sanitary sewer was being installed. -51500.00 . �Expl. This was in reference to Change Order Number 001 and shall be deducted at this time.