Construction Change Order Number 1 Final
Adjust estimated quantities to"as built" quantities for a total increase of$1,872.39.
Passed and approved this 19th day of December, 1995.
e�ooKiy� MaYo
,
.�
� �9 �
1� a�
��� ���
� o.s�
Finance Officer
. � ' `
CHANGE ORDER
'� (Instructions on reverse side) No. 001
PROJEC'I'.....9.�-R6���.......................
DATE OF ISSUANCE .........�.�/.$1��.......... EFFECTIVE DATE ...... 12/8f 95................. ....
OWNER ....Citx..of Brookin�s
............................................................................
OWNER's Contract No.
.................................... .
CONTRAC'POR $A�i�$..GQ����uctio�„ ENGINEER .....City„Engineer......................
You are directed to make the following changes in the Contract Documents.
Description: Increase of $1 ,872.39 to final out project
Reason for Change Order: Adjust estimated quantities to as-built quantities
Attachments: (List documents supporting change)
CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES:
Original Contract Price Original Contract Times
�
_, Substantial Completion:
g 1 6 7,4 3 7.0 0 Ready for final payment: �
d.ys or au«
Net changes from previous Change Orders No._to No._ Net change from previous Change Orders No._to No._
s —u—
�.Y�
Contract Price prior to this Change Order Contract Times prior to this Change Order
1 6 7,4 3 7.0 0 Substandal Completion:
$ Ready for final payment:
a,y�a a�«
Net Increase(�S)of this Change Order Net Increase(decrease)of this Change Order
$ 1 ,872.39
a�ri
Contract Price with all approved Change Orders Contract Times with all approved Change Orders
16 9 3 0 9.3 9 Substantial Completion:
S � Ready for final payment:
days or data
RECO ENDED: APPROVED: ACCEPCED:
�
) By� E ' er� ud ianature BY� Owner lAuthorized Sianawrol By� ��t�Authorv.cd Signaturc)L�
J �Date•-- �02 '!1—�� Date• Datr. v l�/I Z � y 7�
EJCDC No. 1910-8-B (1990 Edition)
Prepared by the Engineers Joint Contract Documents Committee and endorsed by The Associated General Contractors of America.
95-063TI STREET MAINTENANCE PROJECT
; � BOWES CONSTRUCTION
; DECEMBER 7, 1995
, FINAL CHANCiE ORDER
; BOWES TOTAL FINAL TOTAL CHANGE
' ITEM WORK OR MATERIAL UNITS PLAN CONST. PLAN INSTALLED FINAL ORDER
� NO. QUANTITY BID PRICE COST QUANTITY COST COST
�
�
SCHEDULE B: ASPHALT FOB PLANT
1. ASPHALT BASE COURSE TON 1500.00 14.00 21000.00 626.36 8769.04 -12230.96
2. ASPHALT SURFACE COURSE TON 500.00 14.00 7000.00 208.69 2921.66 -4078.34
;
3. ASPHALT CEMENT TON 130.00 156.00 20280.00 50.1827 7828.50 -12451.50
! TOTAL SCHEDULE B: $48,280.00 $19,519.20 ($28,760.80)
] SCHEDULE C: PAVMENT REPLACEMENT
� 1. REMOVE ASPHALT CONCRETE PAVING SQ.YD. 1200 5.00 6000.00 1083.30 5416.50 -583.50
� 2. UNCLASSIFIED EXCAVATION CU.YD. 400 4.20 1680.00 280.60 1178.52 -501.48
' 3. CRTISHED GRAVEL BASE COURSE TON 400 6.00 2400.00 3190.28 19141.68 16741.68
4. ASPHALT CONCRETE BASE COURSE TON 600 23.00 13800.00 192.85 4435.55 -9364.45
; 5. ASPHALT CONCRETE SURFACE COURSE TON 150 23.00 3450.00 116.76 2685.48 -764.52
6. ASPHALT CEMENT TON 47 156.00 7332.00 18.5987 2901.40 -4430.60
TOTAL SCHEDULE C: $34,662.00 $35,759.13 $1,097.13
�
{ SCHEDULE D: STOCRPILE GRAVEL
i
� 1. CRUSHED GRAVEL FOR STOCRPILE TON 1600 3.90 6240.00 1426.06 5561.63 ($678.37)
1 SCHEDULE E: OVERLAY SITES
� l. COLD PAVEMENT ASPHALT MILLING SQ.YD. 3500 1.65 5775.00 4809.20 7935.18 2160.18
2. MOBILIZATION FOR MILLING LUMP 1 2000.00 2000.00 1.00 2000.00 0.00
3. ASPHALT CONCRETE SURFACING TON 2000 23.00 46000.00 2584.59 59445.57 13445.57
' 4. ASPHALT CEMENT TON 130 156.00 20280.00 156.324 24386.54 4106.54
5. ADJUST MANHOLE RIMS EACH 15 200.00 3000.00 13.00 2600.00 -400.00
6. ADJUST WATER VALVE BOXES EACH 10 120.00 1200.00 4.00 480.00 -720.00
TOTAL SCHEDULE E: $78 255.00 $96 847.29
. . $18,592.29
EXTRA: OVERLAY TENNIS COURTS
i ASPHALT CONCRETE SURFACING TON 23.00 0.00 265.43 6104.89 6104.89
ASPHALT CEMENT TON 156.00 0.00 16.4567 2567.25 2567.25
ASPHALT FOR FABRIC MEMBRANE TON 200.00 0.00 3.83 766.00 766.00
FABRIC MEMBRANE SQ.YD. 0.80 0.00 2730.00 2184.00 2184.00
TOTAL EXTRA: $0.00 $11,622.14 $11,622.14
� FINAL CHANGE ORDER AMOUNT 1 872.39