HomeMy WebLinkAboutResolution 118-1996 RESOLUTION NO. 118-96 AUTHORIZING FINAL CHANGE ORDER(CCO#1 FINAL)FOR BRIDGE REPAIR PROJECT P3301(06) PCEMS512S (Industrial Builders, Inc.) BE IT RESOLVED by the City Commission that the following changer order be allowed for the Bridge Repair Project P3301(06)PCEMS512S Construction Changer Order Number 2 (Final� Adjust estimated quantities to"as built" quantities for a total increase of$5,773.35. Passed and approved this 1'7th day of Dece�nber, 1996. �Cl;� � Mayor ` ATTE o �ROOK�N F \i•�`oRebaAiEo,CS c�.� ►�1":R.9 3� : ;,? , �o• . �. � ° � . ''�� Finance Officer DOT-2�OA� '� SOUTH DAKOTA DEPARTMENT OF TRANSPORTATION REV.9-1995 Sheet 1 of 1 Construction Change Order No. 2F PCNO 512s (48-51) Project Number P 3301(06) County Brookings (52-64} Type of Work Bridge Deck Overlay Contract Amt. 126,169.80 (65-80) Contractor Industriai Builders, Inc. The following change in plans and/or specifications for the subject project is hereby made: This CCO provides for the final adjustment of plans quantities to the as constructed quantities as follows: LINE NO.001 P MOBILIZATION +369.39 LINE NO.002P ASPHALT CONCRETE COMPOSITE +33.2 TON LINE NO.007P TYPE 1 B REMOVAL(CONCRETE) -13.9 S�YD LINE NO.008P LOW SLUMP DENSE CONCRETE BRIDGE DECK OVERLAY +12.1 CUYD LINE NO.O10P COLD PLASTIC PAVEMENT MARKING 4" +763 L.F. LINE NO.011 P COLD PLASTIC PAVEMENT MARKING 12' -40 L.F. LINE NO.012P COLD PLASTIC PAVEMENT MARKING 24' -67 L.F. LINE NO.017P FLAGGING -73 HOURS LINE NO.019P TEMPORARY ROAD MARKERS -1760 L.F. LINE NO.020P TYPE 1C REMOVAL(CONCRETE) +20 The above listed items shall be adjusted at their respective contract unit bid prices. Increase this CCO is$5,773.35 Change in working days based on monetary increase is 5.5 days City of Brookings Date e changes contained in this construction change order are Recommended .19_ made in accordance with the provisions of the contract for Approved .19_ subject project and when sccepted by the contractor and Engr.Supervisor or Area Engr. upon approval by the South Dakota Departrnent of or�tingerrt upon tunds being available under the ransporta6on shall become a part of said contract. Area or Region Engineer xisting project ageemeM or upon additional pproved .19_ Federal Aid Furxis being made available by a 19 modified project agreement Accepted Area or Region Engineer BY Division Director Date FOR DIVISION ADMINISTRATOR itle Secretary of Transp. Date FEDERAL HIGHWAY ADMINISTRATION DOT-220E SOUTH DAKOTA DEPARTMENT OF TRANSPORTATION �� " '" REV. 9-1995 Sheet 1 of 2 Backup Sheet to Accompany Construction Change Order No. 2F PCNO 512s (48-51) Project Number P 3301(06) County Brookings (52-64) Type of Work Bridge Deck Overlay Corrtract Amt. 126,169.80 (65-80) Contractor industrial Builders, Inc. Line Std. Bid Item Quantity Current Current No. Item No. Description As Now Change In Price Unit Change In (1-4) (5-12) (13-24) Ordered Quantity (37-43) (44-47 Amount +or- +or- 001 P 009.0001 MOBfLIZATION 27369.390 369.390 1.00 L.S. 369.39 002P 320.0038 ASPHALT CONCRETE COMPOSITE 313.200 33.200 63.00 TON 2091.60 007P 550.0002 TYPE 1 B REMOVAL CONCRETE 125.500 -13.900 35.� SQYD -486.50 008P 550.0009 LO SLMP DNS CONC BR DK OVRLY 62.000 12.100 250.00 CUYD 3025.00 010P 633.1020 COLD PLASTIC PVMT MKG 4" 9323.000 763.000 1.40 L.F. 1068.20 011 P 633.1023 COLD PLASTIC PVMT MKG 12' 0.000 -40.000 4.30 L.F. -172.00 012P 633.1024 COLD PLASTIC PVMT MKG 24' 433.000 -67.000 8.70 L.F. -582.90 017P 634.0102 FLAGGING 27.000 -73.000 12.08 HOUR -881.84 019P 634.0120 TEMPORARY ROAD MARKERS 0.000 -1760.000 0.26 L.F. -457.60 020P 550.0003 TYPE 1C REMOVAL,(CONCRETE) 120.000 20.000 90.00 S(aYD 1800.00 CONTINUATION SHEET(S)TOTAL INCREASE 0 00 CONTINUATION SHEET(S)TOTAL DECREASE 0 00 Prepared By: JOHN RITTERSHAUS Increase This Order(+) $ g,354,1 g Decrease This Order(-) $_ (2,580.84) Net Change This Order(+or-) $ 5,773.35 Net Previous Changes(+or-) $ 13,065.60 Date: 11-19-96 Net Change To Date(+or-) $ 18,838.95 DESCRIPTION &REASON FOR CHANGE: ( Use additional sheets as necessary) LINE NO. 001 P MOBILIZATION +369.39 Contract increased by$18,469.56, which is more than 5%. According to specification 9.10E mobilization shall include the increase in two percent excise tax. Mobilization-$27,000.00+ (2%)($18,469.56) _$27,369.39 LINE NO. 002P ASPHALT CONCRETE COMPOSITE +33.2 TON An additional 33.2 ton of asphalt concrete composite was necessary to satisfactorily complete the work. LINE NO. 007P TYPE 1 B REMOVAL (CONCRETE) -13.9 SG1YD 125.5 SOYD of Type 1 B Removal was done to complete the project.