RESOLUTION NO. 86-96
RESOLUTION AUTHORIZING FINAL CHANGE ORDER(CCO#1 FINAL)FOR
STORM SEWER IMPROVEMENT PROJECT NO. 94-03SSI (B&B CONCRETE)
BE IT RESOLVED by the City Commission that the following change order be allowed
for the Storm Sewer Improvement Project 94-03SSI.
Construction Change Order Number 1 (Final)
Adjust estimated quantities to "as built" quantities for a total increase of$16, 154.20.
Included in this change order is an increase in working days sufficient to allow that no
liquidated damages shall be charged.
Passed and approved this 24th day of September, 996.
:J .
oF gRooK,ti� Mayo
. U:2�1 1���1.
MaR•9 e�
�': 1a83 ?r
��0,. r�<
J(��• •CO.S�•
Finance Officer
�
CHANGE ORDER
(Instructions on reverse side) No. 7
PROJECT ....94-03SSI:.. Schedule A
DATE OF ISSUANCE ...9l.1.8/.96................ EFFECTIVE DATE ....9/18196............,.,
OWNER .......G�.tY..Q�..$r441��ng�.............................................................................
OWNER's Contract No. ....................................
CONTRACTOR ...A..&..8.CAnCz'et�..... ENGINEER ...Cit.y.Enqineer
You are directed to make the following changes in the Contract Documents.
Description: Increase of $1 b, 154.20 to final out the project
Reason for Change Order: Adjust estimated quantities to as-built quantities
Attachments: (List documents supporting change)
CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES:
Original Cuntract Price Original Conhact Times
Substantial Compledon: NOV@mbeZ' 1 , 1994
$ 4����n_n n Ready for fiaal payment:
Aays or daza
Net changes from previous Change Orders No._to No._ Net change from previous Change Orders No._to No._
�
0 0
��
Contract Price prior to this Change Order Contract Times prior to this Change Order
Sutiscanciai Compleoon: NovemUer 1 , 1 994
$ 4 8.8 S 0.0 0 Ready for finai payment:
dan or aa�es
Net[ncrease(decrease)of this Change Order Net[ncrease(�)of this Change Order
$ 16, 154_20 228.5
wor ing �r5
Contract Price with all approved Change Orders Contract Times with all approved Change Orders
Substantial Completion: S@pteIIlUer 10� 1996
$ 6 5,0 0 4.2 0 Ready for final payment:
��a��
RECOMMENDED: �, .aPPROVED: ACCEPTED: `
C..�--� r � .
By� r�Au Si urel BY� Owmr(Amhonzed Si�curel BY� C (Authomed Signrture)
9 -/�-��,
Date: Date: Date: �'/����
EJCDC No. 1910-8-B (1990 EdiUon)
Prepared by the Engineers Joint Cuntract Documents Committee and endorsed by The Associated Ger�aal Convactors of Art�erica.
� 94-Q3SSI
FINAL CHANGE ORDER
� B and B CONCRETE
SEPTEMBER 12, 1996
TOTAL FINAL TOTAL CHANGL ; �
ITEM WORK OR MATERIAL UNITS PLAN B&B PLAN INSTALLED FINAL ORD$R
NO. QUANTITY ID PRIC COST QUANTITY CO3T COST
SCHEDULE A:
SIOUX FALLS AND STEEL CURB INLETS
�
1. INSTALL SIOUX FALLS CURB INLET EACH 30 1145.00 34350.00 42.00 48090.00 13740.00
2. INSTALL SIOUX FALLS- COVER ONLY EACH 10 325.00 3250.00 11.00 3575.00 325.00
3. INSTALL STEEL CURB INLET EACH 5 950.00 4750.00
6.00 5
700.00 950.00
4. REMOVE CURB & GUTTER LIN.FT. 500 4.00 2000.00 568.40 2273.60 273.60
5. INSTALL CURB & GUTTER LIN.FT. 500 9.00 4500.00 568.40 5115.60 615.60
TOTAL SCHEDULE A: $48,850.00 $64,754.20 $15,904.20
EXTRA ITEMSs
FURN. & INSTALL 8" 45 DEG. BEND LUMP 0 250.00 1.00 250.00 250.00
FURN. & INSTALL 6 L.F. OF 8" P.V.C. 0.00 $65,004.20 $16,154.20
HIGH EARLY STRENGTH CONCRETE