Loading...
HomeMy WebLinkAboutResolution 161-1998 RESOLUTION NO. 161-98 RESOLUTION APPROVING CHANGE ORDER(CCO #25) FOR THE BROOKINGS MULTIPLEX CONSTRUCTION PROJECT BE IT RESOLVED by the City Commission that the following change order be allowed for the Brookings MultiPlex Construction Project: Construction Change Order Number 25 Furnish and install the following items listed on the attached sheet Change Order 25 Attachment. Add:...............................................$21,998.00 Phase la Passed and signed on 22"d day of December, 1998. � �V ' � � Mayor ST: �E;:c�cjcr,+ic �,�9,.�F4 ORA I f�.,�S rU ;2 �rR.9 i� , w•� ��'a3 :`Q ,,� _: o °o-�''•• ...,..••J� _..�=i- ' r"' � !v��yG�. � � Finance Officer , Change Order - GC MI-- SELLERS HEROUX DATE: December 21, 1998 CHANGE ORDER NO: (25) Twenty five Z D PROJECT: Area MultiPlex CONTRACT FOR: General Construction n � PROJECT NO: 96-606 p n �o = TO: Mr. Scott Lardy � — Mills Construction Inc. D „ 1311 Main Avenue S -� � Brookings, SD 57006 0 � ��� YOU ARE DIRECTED TO MAKE THE FOLLOWING CHANGES IN THIS CONTRACT: PAGE 1 OF 2 Furnish and install the following items listed on the attached sheet Change Order 25 Attachment. Add: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $21,998.00 Phase la Original Contract Sum . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 5.561.193.00 Net change by previously authorized Change Orders . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 1.107.215.98 Contract Sum prior to this Change Order . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 6.668.408.98 Conuact Sum will(increase) (�ecrexse) (nat�ei�an�c)by this Change Order . . . . . . . . . . . . . . . . . . . $ 21.998.00 New Contract Sum including this Change Order . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 6.690.406.98 Contract Time will (increase) (decre�xsc) (�ge)by . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13 days. Date of Substantial Completion as of the date of this Change Order is Phase lA/1B-4/11/99: Phase 2- 12/15/98 Issued by: _ ,���� ", Architect's Signa re . . Heroux,AIA Agree .to: A to: �' �.- � Sig re Signature �L - •� ' � . C i o� I <2 Contractor Owner ��r n��r�r �,��. :�`� . �i� �3�d � St t Address Street Address �Q��F�t(��S � ,S?� �7� r�� i S,O .S�7�O � Ci��S,ta,,�.t.�e,-�Zi(�p � City State,Zip /� / /��/ �J�r/ 1 / ►"'f'�F1.��f rFv�`�K�e�//I�il�llf-IEiK,I�- 'L��`1�C� �'22�hL /'Ye /rOkSGh/l� . ////DYOr ��- �y-9� Printed Name and Tide Date Printed�Name and Tide � Date 625 S. Minnesota Avenue, Suite 204 • Sioux Falls, South Dakota 57104-4873 • Telephone: 605-332-7850 • Fax: 605-332-3539 Change Order 25 Attachment PROJECT: Brookings Area MultiPlex PROJECT NO: 96-696 DATE: December 21, 1998 PAGE 2 OF 2 Fumish and install the following items in the E�chibition Building Phase lA: 1. Relocate SB-4 located in Storage Room 106 to Room 206 in the Mezzanine. Furnish and install a 3-way keyed switch at two locations to conuol lighting under mezzanine extension. One switch in east conidor adjacent to Public Concourse 108 and the other switch at SB-4 location in Room 206. Furnish and install two single pole keyed switches to control the lighting in the two conidors off the public concourse at location as shown on sheet RE1.9 in lieu of switching from SB-4. 2. Furnish and install seven relays for emergency lighting as shown in detail 2A on sheet RE2.3. Furnish and install a seven gang switch band in Room 206 to control emergency lighting as shown in detail 2 on sheet RE2.3. 3. Furnish and install two 2" empty conduits from Room 111A to Room 206 for future lighting control. Stub up and cap at 6". 4. Furnish and install wet location fittings for nine type 29 fixtures. Lithonia parts#U1718 for `O' ring& U0148 for connector. 5. Furnish and install a single pole keyed switch in lieu of standard switch in Women's Room 109&Men's Room 110. 6. Furnish and install a single pole switch in SB-3 located in Ticket Administration 102 to control receptacles located in the Lobby Tower. 7. Four receptacles in the Public Concourse 108 were intended to be floor mounted receptacles. Revise receptacles to be ceiling mounted. Circuit all four receptacles to the same circuit in LPB. Furnish and install a single pole keyed switch located in the east Public Concourse 108 to control receptacles. 8. Route data/phone outlets in Exhibition Arena underground to TTB located in Electrical Room 111A in lieu of overhead. Three outlets may be routed on common conduit run 1'/a" conduit shall be run to the first outlet, 1" conduit shall be run from first outlet to the second outlet and 3/" conduit shall be run from the second oudet to the third. 9. Furnish and install five exterior type#19 light fixtures to the exterior of the Exhibition Building at the � height of 18' AFG. Locate two fixtures on the east elevation and three fixtures on the west elevation where shown on Change Drawings 15. 10. Relocate and install two type#20 fixtures from the wall to a recessed location under the stair platform in Corridor#121 in the Exhibition Facility Phase 1 a. 11. Electrical Contractor to connect integral duct detectors in RTU-1, and RTU-8 in the fire alarm system per specification. 12. Add two type#13 fixtures to Mechanical Room 202. Circuit to existing lighting circuit in Mechanical Room 202.