HomeMy WebLinkAboutResolution 160-1998 „_ _ . RESOLUTION NO. 160-98 RESOLUTION APPROVING CHANGE ORDER(CCO#24) FOR THE BROOKINGS MULTIPLEX CONSTRUCTION PROJECT BE IT RESOLVED by the City Commission that the following change order be allowed for the Brookings MultiPlex Construction Project: Construction Change Order Number 24 Furn.ish and install the following items in the County Office Building: 1. Furnish and install two 4-way switches, one each to control lighting sequence"D” in Meeting Room 138 and 142. Mount switches adjacent to latch side of doors#139 and #141. 2. Furnish and install two single pole switches adjacent to door#138A to control the two type 2 fixtures designated as `NL' in Meeting Room 138. Furnish and install two single pole switches adjacent to the door#140 to control the two type 2 fixtures designated ad `NL' in Meeting Room#140. 3. Furnish and install a magnetic door holder for door#140. 4. Electrical Contractor to connect integral duct deteciors in RTU-5, RTU-6 and RTU-7 into the fire alarm system per specifications. Add:.....................................$2,686.00 Phase lb Passed and signed on 22"d day of December, 1998. Mayor ATTEST: �;FF:Or;f��, ,,Uy`�V`��P�RRIF�.,CS M^R•9 �a �': - 1883 :o -- - oo`/,� .ao \\ t Finance Officer L . � ,. Change Order - GC MI—R SELLERS HEROUX DATE: December 21, 1998 CHANGE ORDER NO: (24) Twenty four Z D PROJECT: Area MultiPlex CONTRACT FOR: General Construction n � PROJECT NO: 96-606 p n �o = TO: Mr. Scott Lardy � — Mills Construction Inc. D ,T 1311 Main Avenue S � � Brookings, SD 57006 0 „ � YOU ARE DIRECTED TO MAKE THE FOLLOWING CHANGES IN THIS CONTRACT: PAGE 1 OF 1 Furnish and install the following items in the County O�ce Building: 1. Furnish and install two 4-way switches, one each to control lighting sequence `D' in Meeting Rooms 138 and 142. Mount switches adjacent to latch side of doors#139 and#141. 2. Furnish and install two single pole switches adjacent to door#138A to control the two type 2 fixtures designated as `NL' in Meeting Room 138. Furnish and install two single pole switches adjacent to the door#140 to conuol the two type 2 fixtures designated as `NL' in Meeting Room�i140. 3. Furnich and install a magnetic door holder for door# 140. 4. Elecuical Contractor to connect integral duct detectors in RTU-5,RTLT-6 and RTU-7 into the fire alarm system per specifications. Add: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $2,686.00 Phase lb Original Conuact Sum . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 5.561.193.00 Net change by previously authorized Change Orders . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 1.104.529.98 Contract Sum prior to this Change Order . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 6.665.722.98 Contract Sum will (increase) (�ecrease) (net�hange)by this Change Order . . . . . . . . . . . . . . . . . . . $ 2.686.00 New Conuact Sum including this Change Order . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 6.668.408.98 Conuact Time will (increase) (�ecrease) (no�change)by . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . lo day. Date of 8ubstantial Completion as of the date of this Change Order is Phase lA/1B-3/29/99: Phase 2- 12/15/98 Issued by: ArchitecYs Signa re J . Heroux, AIA Agre d to; j ,, Agr to: /�-� Signa e Signature . ��,C'c�� fC� r� ('� • C;f �f ��!T�h s Con ctor Owner ��I 1��G�1A./ ���� • •�. .3/I 3rd ,q � Street Address Street�ddress , ���� � -Sn ��;'�' C�ro�k'� rt4 5 , .S� �7�0� Ci State,Zi CIity.,'State,Zip .��r ���i► �.��r���r�,��� ��/z-L� wm.NhL A. �� us��� ,�id � ���� ��-��-�� Printed Name and Tide Date Printed ame and Tide ��� Date 625 S. Minnesota Avenue, Suite 204 • Sioux Falls, South Dakota 57104-4873 • Telephone: 605-332-7850 • Fax: 605-332-3539