HomeMy WebLinkAboutResolution 160-1998 „_ _ .
RESOLUTION NO. 160-98
RESOLUTION APPROVING CHANGE ORDER(CCO#24) FOR THE
BROOKINGS MULTIPLEX CONSTRUCTION PROJECT
BE IT RESOLVED by the City Commission that the following change order be allowed
for the Brookings MultiPlex Construction Project:
Construction Change Order Number 24
Furn.ish and install the following items in the County Office Building:
1. Furnish and install two 4-way switches, one each to control lighting sequence"D” in
Meeting Room 138 and 142. Mount switches adjacent to latch side of doors#139 and
#141.
2. Furnish and install two single pole switches adjacent to door#138A to control the two
type 2 fixtures designated as `NL' in Meeting Room 138. Furnish and install two
single pole switches adjacent to the door#140 to control the two type 2 fixtures
designated ad `NL' in Meeting Room#140.
3. Furnish and install a magnetic door holder for door#140.
4. Electrical Contractor to connect integral duct deteciors in RTU-5, RTU-6 and RTU-7
into the fire alarm system per specifications.
Add:.....................................$2,686.00 Phase lb
Passed and signed on 22"d day of December, 1998.
Mayor
ATTEST:
�;FF:Or;f��,
,,Uy`�V`��P�RRIF�.,CS
M^R•9 �a
�': - 1883 :o -- -
oo`/,� .ao \\
t
Finance Officer
L . � ,.
Change Order - GC MI—R
SELLERS
HEROUX
DATE: December 21, 1998 CHANGE ORDER NO: (24) Twenty four Z D
PROJECT: Area MultiPlex CONTRACT FOR: General Construction n �
PROJECT NO: 96-606 p n
�o =
TO: Mr. Scott Lardy � —
Mills Construction Inc. D ,T
1311 Main Avenue S � �
Brookings, SD 57006 0 „
�
YOU ARE DIRECTED TO MAKE THE FOLLOWING CHANGES IN THIS CONTRACT: PAGE 1 OF 1
Furnish and install the following items in the County O�ce Building:
1. Furnish and install two 4-way switches, one each to control lighting sequence `D' in Meeting Rooms 138 and 142. Mount
switches adjacent to latch side of doors#139 and#141.
2. Furnish and install two single pole switches adjacent to door#138A to control the two type 2 fixtures designated as `NL' in
Meeting Room 138. Furnish and install two single pole switches adjacent to the door#140 to conuol the two type 2 fixtures
designated as `NL' in Meeting Room�i140.
3. Furnich and install a magnetic door holder for door# 140.
4. Elecuical Contractor to connect integral duct detectors in RTU-5,RTLT-6 and RTU-7 into the fire alarm system per specifications.
Add: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $2,686.00 Phase lb
Original Conuact Sum . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 5.561.193.00
Net change by previously authorized Change Orders . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 1.104.529.98
Contract Sum prior to this Change Order . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 6.665.722.98
Contract Sum will (increase) (�ecrease) (net�hange)by this Change Order . . . . . . . . . . . . . . . . . . . $ 2.686.00
New Conuact Sum including this Change Order . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 6.668.408.98
Conuact Time will (increase) (�ecrease) (no�change)by . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . lo day.
Date of 8ubstantial Completion as of the date of this Change Order is Phase lA/1B-3/29/99: Phase 2- 12/15/98
Issued by:
ArchitecYs Signa re J . Heroux, AIA
Agre d to; j ,, Agr to:
/�-�
Signa e Signature .
��,C'c�� fC� r� ('� • C;f �f ��!T�h s
Con ctor Owner
��I 1��G�1A./ ���� • •�. .3/I 3rd ,q �
Street Address Street�ddress ,
���� � -Sn ��;'�' C�ro�k'� rt4 5 , .S� �7�0�
Ci State,Zi CIity.,'State,Zip
.��r ���i► �.��r���r�,��� ��/z-L� wm.NhL A. �� us��� ,�id � ���� ��-��-��
Printed Name and Tide Date Printed ame and Tide ��� Date
625 S. Minnesota Avenue, Suite 204 • Sioux Falls, South Dakota 57104-4873 • Telephone: 605-332-7850 • Fax: 605-332-3539