HomeMy WebLinkAboutResolution 151-1998 RESOLUTION NO. 151-98 RESOLUTION AUTHORIZING FINAL CHANGE ORDER(CCO#1 FINAL)FOR STREET IMPROVEMENT PROJECT 98-06STI SCHEDULE B, C, E, F & H (BOWES CONSTRUCTION) BE IT RESOLVED by the City Commission that the following change order be allowed for Street Improvement Project 98-06STI SCHEDULE B, C, E, F & H. Construction Change Order Number 1 Final Adjust estimated quantities as "as build" for a total increase of$9,150.84. Passed and approved this 22°d day of December, 1998. Mayor �;�e\�`�RP 0241Fp•,cS � 18 3 .� • �� _-- � ��. " " _ .,� • � Fina�e Officer . � � .� . � , CHANGE ORDER . (Instructions on reverse side) No. 1 PROJECT ..9.$..—R6�T?..S���c�����.,�....C, E, F & H DATE OF ISSUANCE ....12�3�98............... EFFECTIVE DATE ...12/��9,$,,,,,,,,.....,,,.........,. OWNER .�i.t�..R�.�xaa]�i.r�gs.................................................................................... OWNER's Contract No. .................................... CONTRACTOR $owe s..�o�$�����j�pp.. ENGINEER ......�ity,,Fngin�e�:..................... You are directed to make the following changes in the Co�tract Documents. Description: Increase of $9,150.84 to Final out the Project Reason for Change Order: Adjust Estimated Quantities to As—Built Quantities Attachments: (List documents supporting change) CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES: Original Contract Price Original Contract Times Substantiai Completion: g 2 8 6�611.0 0 Ready for final payment: days or dates Net changes from previous Change Orders No.�_to No.�� Net change from previous Change Orders No._to No._ g 0 dxys Contract Price prior to this Change Order Contract Times prior to this Change Order Substantial Completion: g 2 8 6,611.0 0 Ready for final payment: days or data Net increase��a��of this Change Order Net Increase(decrease)of this Change Order g 9,150.84 days 98-O6STI STREET MAINTENANCE PROJECT FINAL CHANGE ORDER: DECEMBER 3,1998 BOWES CONSTRUCTION BOWES TOTAL FINAL TOTAL CHANGE ITEM WORK OR MATERIAL UNITS PLAN UNIT BID INSTALLED FINAL ORDER NO. �UANTITY PRICE COST �UANTITY COST COST SCHEDULE B:ASPHALT F.O.B.PLANT 1. ASPHALT CONCRETE CLASS G TYPE 1 TON 2000 18.50 37000.00 871.23 16117.76 -20882.25 2. ASPHALT CEMENT TON 130 150.00 19500.00 49.84 7476.39 -12023.61 TOTAL SCHEDULE B: $56,500.00 $23,594.15 -$32,905.86 SCHEDULE C: PAVEMENT REMOVAL AND REPLACEMENT i. rstmuvtAarnA�i rAvt . . . . . . _ 2. UNCLASSIFIED EXCAVATION CU.YD. 400 6.50 2600.00 0.00 0.00 -2600.00 3. CRUSHED GRAVEL BASE COURSE TON 400 6.50 2600.00 0.00 0.00 -2600.00 4. ASPHALT CONCRETE CLASS E TYPE 1 TON 300 20.00 6000.00 0.00 0.00 -6000.00 5. ASPHALT CONCRETE CLASS G TYPE 1 TON 300 26.00 7800.00 0.00 0.00 -7800.00 6. ASPHALT CEMENT TON 40 150.00 6000.00 0.00 0.00 -6000.00 TOTAL SCHEDULE C: $27,400.00 $0.00 -$27,400.00 SCHEDULE E:OVERLAY SITES 1. COLD PAVEMENT ASPHALT MILLING SQ.YD. 10000 2.00 20000.00 9662.70 19325.40 -674.60 2. MOBILIZATION FOR MILLING LUMP 1 1760.00 1760.00 1.00 1760.00 0.00 3. ASPHALT CONCRETE CLASS G TYPE 1 TON 3000 24.85 74550.00 3461.91 86028.46 11478.46 4. ASPHALT CEMENT TON 200 150.00 30000.00 204.21 30630.75 630.75 5. ADJUST MANHOLE RIMS EACH 20 200.00 4000.00 12.00 2400.00 -1600.00 6. ADJUST WATER VALVE BOXES EACH 15 120.00 1800.00 7.00 840.00 -960.00 SUBTOTAL SCHEDULE E: $132,110.00 $140,984.61 $8,874.61 EXTRA ITEM: TACK OIL TON 0 168.0 0.00 10.12 1622.46 1622.46 TOTAL EXTRA ITEMS $0.00 $1,622.46 $1,622.46 WILSON AVE: PREP GRAVEL SQ.YD. 0 0.65 0.00 1037.10 674.12 674.12 ASPHALT CONCRETE CLASS E TYPE 1 TON 0 20.00 0.00 12226 2445.20 2445.20 ASPHALT CONCRETE CLASS G TYPE 1 TON 0 24.85 0.00 99.09 2462.39 2462.39 ASPHALT CEMENT TON 0 150.00 0.00 12.74 1911.00 1911.00 TACK OIL TON 0 168.00 0.00 0.34 57.12 57.12 ADJUST WATER VALVE EACH 0 120.00 0.00 1.00 120.00 120.00 TOTAL WILSON AVE $0.00 $7,669.82 $7,669.82 32ND AVE/PRINCE DRIVE PREP GRAVEL SQ.YD. 0 0.65 0.00 7445.10 4839.32 4839.32 ASPHALT CONCRETE CLASS E TYPE 1 TON 0 20.00 0.00 1638.88 32777.60 32777.60 ASPHALT CEMENT TON 0 150.00 0.00 89.31 13396.05 13396.05 TACK OIL TON 0 168.00 0.00 2.48 416.64 416.64 ADJUST MANHOLE RIMS EACH 0 200.00 0.00 1.00 200.00 200.00 ADJUST WATER VALVE BOXES EACH 0 120.00 0.00 10.00 1200.00 1200.00 TRUCKS TO HAUL EXCESS GRAVEL HOUR 0 48.75 0.00 26.25 1279.69 1279.69 LOADER FOR EXCESS GRAVEL HOUR 0 81.00 0.00 6.50 526.50 526.50 TOTAL 32ND AVE/PRINCE DR $0.00 $54,635.80 $54,635.80 TOTAL SCHEDULE E: $132,110.00 $204,912.69 $72,802.69 SCHEDULE F:MULTIPLEX ACCESS ROAD 1. REMOVE 8"P.C.C.FILLET SQ.FT. 130 1.70 221.00 130.00 221.00 0.00 2. REMOVE CURB&GtJTTER LN.FT. 10 3.00 30.00 12.40 37.20 720 3. INSTALL CURB&GUTTER LN.FT. 1690 9.30 15717.00 1605.30 14929.29 -787.71 4. INSTALL 8"P.C.C.FILLET&VALLEY GUTT SQ.FT. 160 6.60 1056.00 187.70 1238.82 182.82 5. INSTALL 6"P.C.C.DRIVEWAY SQ.FT. 760 3.70 2812.00 523.25 1936.03 -875.98 6. CRUSHED GRAVEL BASE COURSE TON 1700 6.50 11050.00 2665.23 17324.00 6274.00 7. ASPHALT CONCRETE CLASS E TYPE 1 TON 600 20.00 12000.00 457.88 9157.60 -2842.40 8. ASPHALT CONCRETE CLASS G TYPE 1 TON 400 25.00 10000.00 319.19 7979.75 -2020.25 9. ASPHALT CEMENT TON 65 150.00 9750.00 42.92 6438.00 -3312.00 SUBTOTAL SCHEDULE F: $62,636.00 $59,261.68 -$3,374.32 EXTRA ITEM: TACK OIL TON 0 168.0 0.00 1.13 189.84 189.84 TOTAL SCHEDULE F: $62,636.00 $59,451.52 -$3,184.48 SCHEDULE H:ALLEY CONSTRUCTION 1. UNCLASSIFIED EXCAVATION CU.YD. 270 6.50 1755.00 270.00 1755.00 0.00 2. CRUSHED GRAVEL BASE COURSE TON 300 6.50 1950.00 251.03 1631.70 -318.31 3. ASPHALT CONCRETE CLASS E TYPE 1 TON 60 20.00 1200.00 68.85 1377.00 177.00 4. ASPHALT CONCRETE CLASS G TYPE 1 TON 60 26.00 1560.00 68.64 1784.64 224.64 5. ASPHALT CEMENT TON 10 150.00 1500.00 8.11 1216.50 -283.50 SUBTOTAL SCHEDULE H: $7,965.00 $7,764.84 -$200.17 EXTRA ITEM: TACK OIL 0 168.00 $0.00 0.23 38.64 38.64 � � � TOTAL SCHEDULE H: $7,965.00 $7,803.48 -$161.53