HomeMy WebLinkAboutResolution 143-1998 RESOLUTION NO. 143-98
RESOLUTION AUTHORIZING FINAL CHANGE ORDER(CCO#1 FINAL) FOR
SIDEWALK ASSESSMENT PROJECT 98-01SWR(T& R CONTRACTING, INC.)
BE IT RESOLVED by the City Commission that the following change order be allowed
for Sidewalk Assessment Project 98-01 SWR.
Construction Change Order Number 1 Final
Adjust estimated quantities as "as build"for a total decrease of$33,126.43.
Passed and approved this 8"'day of December, 1998.
.
�o4�er:�cK,,,,�s Mayor
;..�,��
c.�. M��9 ��
w': �a83 r Q
�o•., •
1
�(� CS C .S `
Finance Officer
. �
CHANGE ORDER
(Instructions on reverse side) No.
PROJECT ........98,-01SWR................... .
DATE OF ISSUANCE .11,/20/98,,,,,,,,,,,,,,,, EFFECTIVE DATE ....11,/20�,98,,,,,,,,,,,,.,,,,,,,,,_,.
OWNER .........�i��..Qf.$�Q4.k?��35...........................................................................
OWNER's Contract No. ....................................
CONTRACTOR .T..k..R.CAn�r.a�c�i.nq.,. IncENGINEER .....CitX..Engin�ex.......................
You are directed to make the following changes in the Contract Documents.
Description: Decrease of $33,126.43 to final out the project.
Reason for Change Order: Adjust estimated quantities to as-built quantities
Attachments: (List documents supporting change)
CHANGE IN CONTR.ACT PRICE: CHANGE IN CONTRACT TIMES:
Original Contract Price Original Contract Times
Substantial Completion: NOVember 1� 19 9 8
$ 8 6�5 0 0.0 0 Ready for final payment:
days or dates
Net changes from previous Change Orders No.0 to No.�- Net change from previous Change Orders No.�to No.1
g 0 0
ady:
Contract Price prior to this Change Order Contract Times prior to this Change Order
Substantial Completion: NOV@IIlb@I' �.. 1998
g 8 6,5 0 0.0 0 Ready for final payment:
days or dates
Net�iarease(decrease)of this Change Order Net Increase�)of this Change Order
g 33,126.43 5 workinq days
days
Contract Price with all approved Change Orders Contract Times with all approved Change Orders
Substantial Completion: NOvem�e?' 6�, 19 9 8 _
$ 5 3,3 7 3.5 7 Ready for final payment: NOV@Mb@Y' 6� 19 9 8 _
days or dates
RECOMMENDED: APPROVED: �
BY� I neer(A o ed Signature) By� Owner(Authorized Signrture) By� trr or(Authorized Signature)
Date: ��� �— �U Date: Date: ��–"� 3"'�1�
EJCDC No. 1910-8-B (1990 Edition)
Prepared by the Engineers Joint Contract Documents Committee and endorsed by The Associated General Contractors of America.
.
,
98-01 CURB&GUTTER&SIDEWALK PROJECT
FINAL CHANGE ORDER: NOVEMBER 19, 1998
T&R CONTRACTING
T&R TOTAL FINAL TOTAL CHANGE
ITEM WORK OR MATERIAL UNITS PLAN UNIT BID INSTALLED FINAL ORQER
N0. QUANTIT�Y PRICE COST QUANTITY COST COST
1. REMOVE 4" P.C.C. SQ.FT. 8000 1.00 8000.00 4819.50 4819.50 -3180.50
2. REMOVE CURB&GUTTER LIN.FT. 1500 4.90 7350.00 1173.30 5749.17 -1600.83
3. REMOVE 6"P.C.C.SIDEWALK SQ.FI". 500 1.00 500.00 128.79 128.79 -371.21
4. REMOVE 6"P.C.C.VALLEY GUTTER&FILLET SQ.Ff. 500 1.40 700.00 113.28 158.59 -541.41
5. INSTALL 4"P.C.C.SIDEWALK SQ.Ff. 9000 2.45 22050.00 6275.54 15375.07 -6674.93
6. INSTALL 6" REINFORCED P.C.C. SQ.FI'. 200 3.50 700.00 0.00 0.00 -700.00
7. INSTALL 6"P.C.C.SIDEWALK&APPROACH SQ.FT. 3000 3.00 9000.00 1878.48 5635.44 -3364.56
8. INSTALL CURB&GUTTER LIN.FT. 2000 12.75 25500.00 1100.20 14027.55 -11472.45
9. INSTALL 8"P.C.C.VALLEY GUTTER&FILLET SQ.FT. 2500 4.10 10250.00 1101.74 4517.13 -5732.87
10. AD)UST WATER CURB STOP EACH 5 40.00 200.00 0.00 0.00 -200.00
11. CONCRETE SAWING LIN.FT. 500 2.50 1250.00 552.80 1382.00 132.00
12. REMOVE ASPHALT CONCREi'E PAVEMENT SQ.FT. 1000 1.00 1000.00 1635.45 1635.45 635.45
SUBTOTAL CHANGE ORDER: $86,500.00 $53,428J0 -$33,071.30
DEDUCTION: 1803 ORCHARD SIDEWALK SQ.FT. 0.00 2.50 $0.00 22.05 -55.13 -55.13
$86,500.00 $53,373.57 -$33,126.43