RESOLUTION NO. 102-98
RESOLUTION APPROVING CHANGE ORDER(CCO#19)
FOR BROOKINGS MULTIPLEX CONSTRUCTION PROJECT
BE IT RESOLVED by the City Commission that the following change order be allowed
for the Brookings MultiPlex Construction Project:
Construction Change Order Number 19
Furnish and install two 24" wide base cabinets with two drawers and an adjustable shelf in Room
141 in lieu of open locations for future dishwashers.
Add:..............................................................................$644.00 Phase lb
Furnish and install one new 4' 2"x 4' 2"hollow metal window in Break Room 139.
Add:..............................................................................$594.00 Phase lb
Furnish and install counters, cabinets and relocated electrical and telephone outlets in Workroom
133 as shown on Proposal Drawing PD-1 dated April 20, 1998 and revised July 29, 1998.
Add:.............................................................................$4,310.00 Phase lb
TOTAL: $5,548.00
Passed and approved this 8`� day of September, 1998.
� �
Mayor
!`�y •;o��TE6••�'s
i:U.
�; `,h5',R.9 '�a
�' 1€a3 :�
�,� .
`.�����;:,';��,���`
Finance Officer
�
��
Change Order - GC SEILLERS
HEROUX
DATE: September 3, 1998 CHANGE ORDER NO: (19) Nineteen z �
PROJECT: Area MultiPlex CONTRACT FOR: General Construction �
o �
PROJECT NO: 96-606 � _
� _
o �
TO: Mr. Scott Lardy D m
Mills Construction Inc. n
m —1
1311 Main Avenue S � �"
Brookings, SD 57006 ��
PAGE 1 OF 1
YOU ARE DIRECTED TO MAKE THE FOLLOWING CHANGES IN THIS CONTRACT:
Furnish and install two 24" wide base cabinets with two drawers and an adjustable shelf in Room 141 in lieu of open locations
for future dishwashers.
Add: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $644.00 Phase lb
Furnish and install one new 4'-2" x 4'-2" hollow metal window in Break Room 139.
Add: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $594.00 Phase lb
Furnish and install counters, cabinets and relocated electrical and telephone outlets in Workroom 133 as shown on Proposal
Drawing PD-1 dated Apri120, 1998 and revised July 29, 1998.
Add: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $4,310.00 Phase lb
Original Contract Sum . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 5.561.193.00
Net change by previously authorized Change Orders . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 1.048.181.98
Contract Sum prior to this Change Order . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 6.609.374.98
Contract Sum will (increase) (decreasc) (�e)by this Change Order . . . . . . . . . . . . . . $ 5.548.00
New Contract Sum including this Change Order . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 6.614.922.98
Contract Time will (increase) (deerease) (aetehaage)by . . . . . . . . . . . . . . . . . . . . . . . . . . 0 days.
Date of Substantial Completion as of the date of this Change Order is Phase lA/1B -3/18/99: Phase 2-7/1/98
Issued by:
Architect's Signatur J. . Heroux,AIA
Agreed to: Agreed to:
G� � +�
Signature Signatur
/�/U-S C�l��7YL�x��/�,. /�c/t'_ ' 1
Contractor Owner
l�� ��,�x� ,�.�� . �. 21 � 3. Y..�
Street Address S� t Address
�g�,e�.v'�s, s.� S�oo� r o e � �Ts� S -��`�'00 ro
Ci State,Zip Ciry, tate,Zip
�e�r-r�+�� a�cYr m►a�i��.e 9-8-9� �.! ,���p � . -�a �� 5 ��, ; )��(a �o r
Printed Name and Tide Date P�ted ame and Tide � Date
625 S. Minnesota Avenue, Suite 204 • Sioux Falls, South Dakota 57104-4873 • Telephone: 605-332-7850 • Fax: 605-332-3539