' � RESOLUTION NO. 62-98
RESOLUTION APPROVING CHANGE ORDER(CCO#7)
FOR BROOKINGS MULTIPLEX CONSTRUCTION PROJECT
BE TT RESOLVED by the City Commission that the following change order be allowed
for the Brookings MultiPlex Construction Project:
Construction Change Order Number 7
Provide heavy duty hinges and edges on kitchen cabinets. Add $ 721.00
Furnish and insta112 fourplex electrical outlets and one telephone/data junction box in each
furred out column in Open office 135. Add $ 538.00
Furnish and install two 2"PVC pipes underground from Electrical Room to Storage Room 127
for future telephone and data lines. Change electric service entry to east side.
Add $ 00.00
Relocate one existing tree from the existing county Extension Office to a designated area on the
building site to be selected by the architect. Verify tree to be relocated with county
representative. Add $ 191.00
Relocate door and frame#124 and change door swing per Drawing PD-5
Add $ 00.00
Change to larger window in all offices (3' 8"high x 4' 8"wide).
Add $2,465.00
Furnish and install two additional combination voice data outlets in common two gang flush wall
boxes, Break room#137. Omit telephone outlet on the east wall.
Add $ 38.00
Furnish and install one exterior light pole and fixture similar to lights in front of building
between the east parking lot and north door of county offices.
Add $4,618.00
TOTAL $8,571.00
Passed and approved this 23rd day of June, 1998.
Mayor
\� .a o�ur� S
:�v
;' " ' �,r,R.9 :a
�
�: :Q -
o' o -- - �
,i,� • �
Finance Officer
06-16-1998 10�54AM M1LLER SELLERS HEROUX P.04
. '.
.,, . .
�
. '
j
. ��
Change Order - GC MFY T-��
; HEROUX
DATE: June 16, 1998 CHANGE QRDER NO: (�Seven(revised) � z D
PROJECT: Area MuleiPlex CONTRACT FOR: General Coastttictlonl � �
PROJECT NO: 96-606 a�
� � x
'�O: Mr. ScOtt Lardy : O-i
MillS Co�structfOII InC. D"'
1311 Main Avenne 5 n
� m�
Brookings, SD 37006 d"'
��
� � PA,GE 2 OF 2
1. Provide heavy dury hinges a�d tdges on lcitch�n cabinets. � �
2. �lunisti and ins[all 2 fourptex eleecrieal oudets and on�t�lephone/data junction box in each flirred out eolumn in Open
Office 135.
3, F�rnish and iascall avo 2"PVC pipes undergraund hom Eleccrical Room to Storage Itoom 127 f�ni fimue telephone and
data lirues. Change electric�ervice cntry to east side.
4. Relocate one eaiscing vee from the ez�stiag County Bxtenslon Offlce to a designatod area on die building she ro be
selectal by the architect. Verify tree to ba relocated with county representative. '
�
5. Itelocate door and frame#124 and change door swing per Drawing PD-5 i
6. Change to larger wiadow in all offlces(3'-8•high x 4'-S" wide).
7. Fumish and install two addicionai combinatian voice daca ou[ltts in�ommon iwo gang flush wall boxes. Breai: Room
N137. Omit telephone outlu on the east wall.
g. FUrnish aud lnstall one euerior llght pole and fixture similar to llglits ia$ont of buildiag between the east pazl�g lot and
north door of co�nty offices. �
i
.
�
I
I
I
�
�
I
�
. �
625 S. Mimte.sota Avenue,Suite 204 • Sioux Falls.Scnuh Uakotn 57104-4$13 • Teleplwne: 605-332-7ti50• F9x: 603-332-3539
�
I
,,�, • .
��
Change Order - GC MILLER
SELLERS
HEROUX
DATE: June 16, 1998 CHANGE ORDER NO: (7) Seven(revised) Z D
n �
PROJECT: Area MultiPlex CONTRACT FOR: General Construction p n
PROJECT NO: 96-606 '� _
� _
TO: Mr. Scott Lardy � �
70 m
Mills Construction Inc. D n
�
1311 Main Avenue S ^� �
Brookings, SD 57006 � �
��
YOU ARE DIRECTED TO MAKE THE FOLLOWING CHANGES IN THIS CONTRACT: PAGE 1 OF 2
1. See Attached
Add . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $721.00 Phase lb
2. See Attached
ADD . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $538.00 Phase lb
3. See Attached
No Cost . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $0.00 Phase lb
4. See Attached
Add . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $191.00 Phase lb
5. See Attached.
No Cost . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $0.00 Phase lb
6. See Attached
Add: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $2,465.00 Phase lb
7. See Attached
Add: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $38.00 Phase lb
8. •See Attached
Add: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $4,618.00 Phase lb
Original Contract Sum . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 5.561.193.00
Net change by previously authorized Change Orders . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 212.334.98
Contract Sum prior to this Change Order . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 5.773.527.98
Contract Sum will (increase) (deerexse) (ne�ehxnge) by this Change Order . . . . . . . . . . . . . . $ 8.571.00
New Contract Sum including this Change Order . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 5.782.098.98
Contract Time will (increase) (decreRse) (�ge)by • • • • • • • • • • • • • • • • • • • • • • • • • • • 0 days.
Date of Substantial Completion as of the date of this Change Order is Phase lA/1B - 3/18/99: Phase 2 -7/1/98
Issued by:
Architect's Signa J.M. eroux, AIA
Agreed to: Agre d to:
�� I
b Signatur �S � �
Sy���.s �'v ��-����7r��.l� ��t�- � o` �o o �n �
Contracror �W�� �/
/'�%I /'��i�'�f�t.r �f-Il F • � � 3 r� � v��..
Str,e�,Address ,S�reg t Address
t`il3'�71�i�(.�E�.S.��'Q �'7��� ,CS r O a��r.�.s� s� 5 ��O�
Ci State,Zi Ci State,Zip 1 �
���.�r;-7"r c../�Ka� ,�1�TEt��,�tr9�sF�2 1 � � � n e -�,�u s �h � � 7 -I-��
PrinteJ Name and Title Da� Printed Na nd Title Date
lv/�•I/9�'�
625 S. Minnesota Avenue, Suite 204 • Sioux Falls, South Dakota 57104-4873 • Telephone: 605-332-7850 • Fax: 605-332-3539