HomeMy WebLinkAboutResolution 38-1998 * ,
RESOLUTION NO. 38-98
RESOLUTION AUTHROIZING FINAL CHANGE ORDER(CCO#1 FINAL)FOR
STORM 5EWER PROJECT 97-03SSI SCHEDULE B (PRUNTY CONSTRUCTIOl�
BE IT RESOLVED by the City Commission that the following change order be allowed
for the Storm Sewer Project 97-035SI Schedule B
Construction change Order Nuxnber 1 (Final)
Adjust estimated quantities to"as build"for a total decrease of$17,804.62.
Passed and approved this Sth day of May, 1998.
�
Mayor
o`�
� � .
� M��9 ~
m� 1�3 �o!
00
__..._ ) --
� � Sp s
Finance Officer
' �
�
97-03SS1: Schedule B
STORM SEWER IMPROVEMENT PROJECT
APRIL 27, 1998
FINAL CHANGE ORDER: PRUNTY CONSTRUCTION �
TOTAL FINAL TOTAL CHANGE
ITEM WORK OR MATERIAL UNITS PLAN PRUNTY PLAN INSTALLED FINAL ORDER
NO. QUANTITY BID PRICE COST QUANTITY COST COST
Schedule B: STORM SEWER IMPROVEMENTS
1. REMOVE/DISPOSE CURB AND GUTTER LN.FT. 100 6.00 600.00 136.00 816.00 216.00
2. FURNISH & INSTALL 12" PVC STORM LN.FT. 200 17.64 3528.00 94.00 1658.16 -1869.84
SEWER(ASTM 3005)
3. FURNISH & INSTALL 15" RCP LN.FT. 100 24.09 2409.00 0.00 0.00 -2409.00
4. FURNISH & INSTALL 15" RCP SAFETY END EACH 1 543.20 543.20 0.00 0.00 -543.20
WITH BARS
5. FURNISH & INSTALL 15" PVC STQRM LN.FT. 650 20.70 13455.00 486.00 10060.20 -3394.80
SEWER(ASTM 3035)
6. FURNISH & INSTALL 15" PVC 45 DEG. EACH 1 210.00 210.00 2.00 420.00 210.00
BEND(ASTM 3035)
7. FURNISH & INSTALL 18" RCP LN.FT. 200 27.24 5448.00 182.00 4957.68 -490.32
8. FURNISH & INSTALL 18" RCP 15 DEG. BEND EACH 2 391.50 783.00 2.00 783.00 0.00
9. FURNISH & INSTALL 24" RCP LN.FT. 400 33.29 13316.00 380.00 12650.20 -665.80
10. FURNISH & INSTALL 24" RCP 15 DEG. BEND EACH 1 502.00 502.00 � 1.00 502.00 0.00
11. INSTALL 30" CURB AND GUTTER LN.FT. 100 18.70 1870.00 16.60 310.42 -1559.58
12. INSTALL 8" P.C.C. VALLEY GUTTER &FILLET SQ. FT. 500 5.34 2670.00 364.00 1943.76 -726.24
13. INSTALL STORM SEWER MANHOLE EACH 3 1616.50 4849.50 3.00 4849.50 0.00
14. INSTALL SIOUX FALLS TYPE INLET EACH 5 2067.50 10337.50 2.00 4135.00 -6202.50 �
(Including City Furnished Manhole Lid)
15. INSTALL STORM SEWER AREA INLET EACH 2 1781.50 3563.00 2.00 3563.00 0.00
16. CONCRETE SAWING LN.FT. 50 7.70 385.00 5.00 38.50 -346.50
17. INSTALL 6" P.C.C. SPLASH PAD SQ. FT. 30 3.30 99.00 0.00 0.00 -99.00
$64,568.20 $46,687.42 -$17,880.78
Extra Items:
REMOVE 4" P.C.C. SIDEWALK SQ. FT. 0.00 $1.00 0.00 22.40 22.40 22.40
INSTALL 4" P.C.C. SIDEWALK SQ. FT. 0.00 $2.40 0.00 22.40 53.76 53.76
0.00 $76.16 $76.16
' TOTAL SCHEDULE B CHANGE ORDER: $64,568.20 $46,763.58 - 17,804.62
CHANGE ORDER
� �
(Instructions on reverse side) No. �
PROJECT ....�.7-Q3SS.I....SGH�AIIL.�.�..
DATE OF ISSUANCE .4I.2��9�.................. EFFECTIVE DATE ....41.28l98......................:.... .
OWNER .....G.�TX..4F..�R4.OK.�NG.S................................................................................
OWNER's Contract No. ...................:................
CONTRACTOR ..PRiJN�Y..CONSTRUC7IDN ENGINEER ......Ci•TY••EN6INEEF�•••••••••••••••••••••
You are directed to make the following changes in the Contract Documents.
Description: DECREASE OF $17,gO4.6Z TO FINAL OUT THE PROJECT
Reason for Change Order: ADJUST EST I MATED �UANT I T I ES TO AS-BU I LT QUANT I T I ES
Attachments: (List documents supporting change)
CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES:
Original Contract Price Original Contract Times
Substantial Completion: OGTOBER �, �qq7 __
$ 64,�6g.2n Ready for final payment:
days or data
Net changes from previous Change Orders No._to No._ Net change from previous Change Orders No._to No._
$ -�- -�- �,Y$
Contract Price prior to this Change Order Contract Times prior to this Change Order
Substantial Completion: OGTOBER � , �qq7 ____
$ 64,�6g.2� Ready for final payment:
days or dales
Net����(decrease)of this Change Order �� Net Increase�of this Change Order
$ l��Q�!�� �� 32
days
Contract Price with all approved Change Orders Contract Times with all approved Change Orders
Substantial Completion: APR I L 15. 1998
$ 46.763.5$ Ready for final payment:
days or dates
RECO ENDED: APPROVED: ACCEPTED� ���
BY� En n r(A�rize ignatu By� Owner(Authorized Signaturc) BY� Contractor(Authorized Signaturc)
Date: S� — �S Date: Date: / � 2 � _ � v
EJCDC No. 1910-8-B (1990 Edition)
Prepared by the Engineers Joint Contract Documen[s Commit[ee and endorsed by The Associa[ed General Contractors of America.