Loading...
HomeMy WebLinkAboutResolution 38-1998 * , RESOLUTION NO. 38-98 RESOLUTION AUTHROIZING FINAL CHANGE ORDER(CCO#1 FINAL)FOR STORM 5EWER PROJECT 97-03SSI SCHEDULE B (PRUNTY CONSTRUCTIOl� BE IT RESOLVED by the City Commission that the following change order be allowed for the Storm Sewer Project 97-035SI Schedule B Construction change Order Nuxnber 1 (Final) Adjust estimated quantities to"as build"for a total decrease of$17,804.62. Passed and approved this Sth day of May, 1998. � Mayor o`� � � . � M��9 ~ m� 1�3 �o! 00 __..._ ) -- � � Sp s Finance Officer ' � � 97-03SS1: Schedule B STORM SEWER IMPROVEMENT PROJECT APRIL 27, 1998 FINAL CHANGE ORDER: PRUNTY CONSTRUCTION � TOTAL FINAL TOTAL CHANGE ITEM WORK OR MATERIAL UNITS PLAN PRUNTY PLAN INSTALLED FINAL ORDER NO. QUANTITY BID PRICE COST QUANTITY COST COST Schedule B: STORM SEWER IMPROVEMENTS 1. REMOVE/DISPOSE CURB AND GUTTER LN.FT. 100 6.00 600.00 136.00 816.00 216.00 2. FURNISH & INSTALL 12" PVC STORM LN.FT. 200 17.64 3528.00 94.00 1658.16 -1869.84 SEWER(ASTM 3005) 3. FURNISH & INSTALL 15" RCP LN.FT. 100 24.09 2409.00 0.00 0.00 -2409.00 4. FURNISH & INSTALL 15" RCP SAFETY END EACH 1 543.20 543.20 0.00 0.00 -543.20 WITH BARS 5. FURNISH & INSTALL 15" PVC STQRM LN.FT. 650 20.70 13455.00 486.00 10060.20 -3394.80 SEWER(ASTM 3035) 6. FURNISH & INSTALL 15" PVC 45 DEG. EACH 1 210.00 210.00 2.00 420.00 210.00 BEND(ASTM 3035) 7. FURNISH & INSTALL 18" RCP LN.FT. 200 27.24 5448.00 182.00 4957.68 -490.32 8. FURNISH & INSTALL 18" RCP 15 DEG. BEND EACH 2 391.50 783.00 2.00 783.00 0.00 9. FURNISH & INSTALL 24" RCP LN.FT. 400 33.29 13316.00 380.00 12650.20 -665.80 10. FURNISH & INSTALL 24" RCP 15 DEG. BEND EACH 1 502.00 502.00 � 1.00 502.00 0.00 11. INSTALL 30" CURB AND GUTTER LN.FT. 100 18.70 1870.00 16.60 310.42 -1559.58 12. INSTALL 8" P.C.C. VALLEY GUTTER &FILLET SQ. FT. 500 5.34 2670.00 364.00 1943.76 -726.24 13. INSTALL STORM SEWER MANHOLE EACH 3 1616.50 4849.50 3.00 4849.50 0.00 14. INSTALL SIOUX FALLS TYPE INLET EACH 5 2067.50 10337.50 2.00 4135.00 -6202.50 � (Including City Furnished Manhole Lid) 15. INSTALL STORM SEWER AREA INLET EACH 2 1781.50 3563.00 2.00 3563.00 0.00 16. CONCRETE SAWING LN.FT. 50 7.70 385.00 5.00 38.50 -346.50 17. INSTALL 6" P.C.C. SPLASH PAD SQ. FT. 30 3.30 99.00 0.00 0.00 -99.00 $64,568.20 $46,687.42 -$17,880.78 Extra Items: REMOVE 4" P.C.C. SIDEWALK SQ. FT. 0.00 $1.00 0.00 22.40 22.40 22.40 INSTALL 4" P.C.C. SIDEWALK SQ. FT. 0.00 $2.40 0.00 22.40 53.76 53.76 0.00 $76.16 $76.16 ' TOTAL SCHEDULE B CHANGE ORDER: $64,568.20 $46,763.58 - 17,804.62 CHANGE ORDER � � (Instructions on reverse side) No. � PROJECT ....�.7-Q3SS.I....SGH�AIIL.�.�.. DATE OF ISSUANCE .4I.2��9�.................. EFFECTIVE DATE ....41.28l98......................:.... . OWNER .....G.�TX..4F..�R4.OK.�NG.S................................................................................ OWNER's Contract No. ...................:................ CONTRACTOR ..PRiJN�Y..CONSTRUC7IDN ENGINEER ......Ci•TY••EN6INEEF�••••••••••••••••••••• You are directed to make the following changes in the Contract Documents. Description: DECREASE OF $17,gO4.6Z TO FINAL OUT THE PROJECT Reason for Change Order: ADJUST EST I MATED �UANT I T I ES TO AS-BU I LT QUANT I T I ES Attachments: (List documents supporting change) CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES: Original Contract Price Original Contract Times Substantial Completion: OGTOBER �, �qq7 __ $ 64,�6g.2n Ready for final payment: days or data Net changes from previous Change Orders No._to No._ Net change from previous Change Orders No._to No._ $ -�- -�- �,Y$ Contract Price prior to this Change Order Contract Times prior to this Change Order Substantial Completion: OGTOBER � , �qq7 ____ $ 64,�6g.2� Ready for final payment: days or dales Net����(decrease)of this Change Order �� Net Increase�of this Change Order $ l��Q�!�� �� 32 days Contract Price with all approved Change Orders Contract Times with all approved Change Orders Substantial Completion: APR I L 15. 1998 $ 46.763.5$ Ready for final payment: days or dates RECO ENDED: APPROVED: ACCEPTED� ��� BY� En n r(A�rize ignatu By� Owner(Authorized Signaturc) BY� Contractor(Authorized Signaturc) Date: S� — �S Date: Date: / � 2 � _ � v EJCDC No. 1910-8-B (1990 Edition) Prepared by the Engineers Joint Contract Documen[s Commit[ee and endorsed by The Associa[ed General Contractors of America.