HomeMy WebLinkAboutResolution 04-1998 1' ' RESOLUTION NO. 4-98 RESOLUTION APPROVING CHANGE ORDER(CCO#3 AND CCO#4) FOR BROOKINGS MULTIPLEX CONSTRUCTION PROJECT BE IT RESOLVED by the Ciry Commission that the following change order be allowed for the Brookings MultiPlex Construction Project: Construction Change Order Number 3 Change the size of the first three joists located south of grid F.1. The northernmost shall be changed to 32LH 15, the other two joists shall be 32LH14. Add a joist 2.5' north of each of the first four joists located south of grid F.l. The northernmost joist is to be 32LH15, the other three joists shall be 32LH 14. Add $10,440.14 Construction Change Order Number 4 Redesign the slab and foundation wall connections per change drawings CD-1 and CD-2. Omit 24" insulation under slabs. Deduct($1,275.01) Delete two compartment sink in Concessions Room 107 and furnish and install one three compartment sink in the same location. Add $354.85 Change the insurance requirements for the project per Mills Construction letter, dated 12/17/97. Deduct ($1,500.00) Passed and approved this 20`� day of January, 1998. � Mayor A o ;��i� �� ,Qyo�uiEa••.,s c���µ.�,9 �:< E i �883 'Y G�'•., .�J��f ,�, ,�`� Finance Officer r ' D E C 17 i99� � Change Order - GC ELLERS HEROUX DATE: December 10, 1997 CHANGE ORDER NO: (3) Three z � PROJECT: Agri-Plex CONTRACT FOR: General Construction � n O PROJECT NO: 96-606 � _ -o _ O -� TO: Mr. Scott Lardy A m n Mills Construction Inc. ,T � 1311 Main Avenue S � `^ Brookings, SD 57006 �� PAGE 1 OF 1 YOU ARE DIRECTED TO MAKE THE FOLLOWING CHANGES IN THIS CONTRACT: Snow Drift Provision at Meeting Rooms - North In order to provide for future snow drift capaciry for the case in which additional construction is located north of, and adjacent to, the north side of the meeting rooms, the roof framing indicated on S1.6 should be revised as described below: "Change the size of the first three joists located south of grid F.1. The northernmost shall be changed to 32LH 15, the other two joists shall be 32LH14. Add a joist 2.5' north of each of the first four joists located south of grid F.1. The northernmost joist is to be 32LH15, the other three joists shall be 32LH14." Add . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $10,440.14 Original Contract Sum . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 5.561.193.00 Net change by previously authorized Change Orders . . . . . . . . . . . . . . . . . . . . . $ 181.684.00 Contract Sum prior to this Change Order . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 5.742.877.00 Contract Sum will (increase) (decrease) (not�range) by this Change Order . . . . . . $ 10.440.14 New Contract Sum including this Change Order . . . . . . . . . . . . . . . . . . . . . . . $ 5.753.317.14 Contract Time will (increase) (decrcase) (not change)by . . . . . . . . . . . . . . . . . . 0 days. Date of Substantial Completion as of the date of this Change Order is Phase lA/1B - 12/18/98: Phase 2 - 7/1/98 Issued by: Architect's Sig re J.M. He[oux,AIA Agreed to: Agre�to: ����ti ^ Signature Signature . M���; ��Sr2�.�c,-Tio�l , /�tC - � � Convactor Owner ���� M�r�v �V�. • � � -3 1 1 3 �- �.�� Street Address Stree ddress , p .1��.�''I���ILf�� � � S'J�lp .�Lc�2.t.r��,�� _.d._ � _ �7�' o,� Ci�,�S�tate,Zip Ciry�State,Zip 1 7C�= i. I (.��(ZuY , ��l ���� IY)l��• /Z�i�� �'� N � R � �A I�/ ' ' � c7 /�/ff ye�� Printed Name and Tide Date Printed N e and Tide Date � � �� �� 625 S. Minnesota Avenue, Suite 204 • Sioux Fa11s,South Dakota 57104-4873 • Telephone: 605-332-7850 • Fax: 605-332-3539