HomeMy WebLinkAboutResolution 117-1999 ` RESOLUTION NO. 117-99
RESOLUTION AUTHORIZING FINAL CHANGE ORDER(CCO#2 FINAL)FOR
STREET Il��IPROVEMENT PROJECT 99-06STI, SCHEDULE A, B, C, D, E, &F(BOWES
CONSTRUCTION)
BE IT RESOLVED by the City Council that the following change order be allowed for
Street Improvement Project 99-06STI.
Construction Change Order Number 2 Fina1
Adjust estimated quantities as"as build" for a total decrease of$61,304.44.
Passed and approved this 13�'day of December, 1999.
�
Mayor
ATT � „r�
.� ;.�-
,. .,•;�;
c,;•���• ''�o•.
MAR.9 �
°°` 1883. '''�,��
' �=�'.r �
�•S\�\- �!%
City Cler�
99-06STI STREET MAINTENANCE PROJECT
CHANGE ORDER#2(FINAL): December 3, 1999
Bowes Construction TOTAL FINAL TOTAL CHANGE
ITEM UNITS PLAN UNIT PLAN INSTALLED FINAL ORDER
NO. WORK OR MATERIAL QUANTITY PRICE COST QUANTITY COST COST
SCHEDULE B:ASPHALT F.O.B. PLANT
1. ASPHALT CONCRETE CLASS G TYPE 1 TON 1000 18.50 18500.00 0.00 0.00 -18500.00
2. ASPHALT CONCRETE CLASS E TYPE 1 TON 1000 17.50 17500.00 470.03 8225.53 -9274.48
3. ASPHALT CEMENT TON 130 155.00 20150.00 28.078 4352.09 -15797.91
TOTAL SCHEDULE B: $56,150.00 $12,577.62 -$43,572.39
SCHEDULE C: PAVEMENT REMOVAL AND REPLACEMENT ',
1. REMOVE ASPHALT PAVEMENT SQ.YD. 1200 2.50 3000.00 15.90 39.75 -2960.25 I
2. UNCLASSIFIED EXCAVATION CU.YD. 400 6.50 2600.00 2.60 16.90 -2583.10
3. CRUSHED GRAVEL BASE COURSE TON 400 6.50 2600.00 0.00 0.00 -2600.00
4. ASPHALT CONCRETE CLASS E TYPE 1 TON 300 23.00 6900.00 0.00 0.00 -6900.00
5. ASPHALT CONCRETE CLASS G TYPE 1 TON 300 28.00 8400.00 0.00 0.00 -8400.00
6. ASPHALT CEMENT TON 40 155.00 6200.00 0.00 0.00 -6200.00
7. ASPHALT TACK COAT TON 5 220.00 1100.00 0.00 0.00 -1100.00
TOTAL SCHEDULE C: $30,800.00 $56.65 -$30,743.35
SCHEDULE D:CRUSHED GRAVEL
1. CRUSHED GRAVEL FOR STOCKPILE TON 1600 3.90 6240.00 1486.32 5796.65 -443.35
TOTAL SCHEDULE D: $6,240.00 $5,796.65 -$443.35
SCHEDULE E:OVERLAY SITES
1. COLD PAVEMENT ASPHALT MILLING SQ.YD. 6000 2.10 12600.00 7422.00 15586.20 2986.20
2. MOBILIZATION FOR MILLING LUMP 1 1900.00 1900.00 1.00 1900.00 0.00
3. ASPHALT CONCRETE CLASS G TYPE 1 TON 1500 24.85 37275.00 1916.24 47618.56 10343.56
4. ASPHALT CEMENT TON 100 155.00 15500.00 106.02 16433.10 933.10
5. ASPHALT TACK COAT TON 10 220.00 2200.00 4.69 1031.80 -1168.20
6. ADJUST MANHOLE RIMS EACH 20 210.00 4200.00 8.00 1680.00 -2520.00
7. ADJUST WATER VALVE BOXES EACH 15 120.00 1800.00 10.00 1200.00 -600.00
TOTAL SCHEDULE E: $75,475.00 $85,449.66 $9,974.66
SCHEDULE F:ALLEY CONSTRUCTION
1. UNCLASSIFIED EXCAVATION CU.YD. 1270 6.50 8255.00 1270.00 8255.00 0.00
2. CRUSHED GRAVEL BASE COURSE TON 1300 6.50 8450.00 1234.28 8022.82 -427.18
3. ASPHALT CONCRETE CLASS E TYPE 1 TON 290 20.00 5800.00 403.63 8072.60 2272.60
4. ASPHALT CONCRETE CLASS G TYPE 1 TON 290 26.00 7540.00 345.75 8989.50 1449.50
5. ASPHALT CEMENT TON 45 155.00 6975.00 45.463 7046.77 71.77
6. ASPHALT TACK COAT TON 1 220.00 220.00 1.515 333.30 113.30 �
TOTAL SCHEDULE F: $37,240.00 $40,719.99 $3,479.99 '
TOTAL CHANGE ORDER#2(FINAL) $205,905.00 $144,600.56 -$61,304.44 �,
.�
, ...
CHANGE ORDER • �
(Instructions on reverse side) No. 2
PROJECT .��..-46$.��=...$��?-...�.�.��..1?.�E & F
DATE OFISSUANCE ..12/3/99,,,,,,,,,,,,,,,,, EFFECTIVEDATE ..12/3/9.9,,,.,,,,,,,,,,,,,_,._,,,,,.,, �
OWNER .C�4�3�..P.�..��QQk��.q�....................................................................................
OWNER's Contract No. ....................................
CONTRACTOR Bowes,Construct,�.on,,. ENGINEER ...G�.��..�nq�.���x.........................
You are directed to make the following changes in the Contract Documents.
Description: Decrease of $61304.44 to final out the Project
Reason for Change Order: Adjust estimated quantities to As-Built Quantities
Attachments: (List documents supporting change)
CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES: �
Original Contract Price Original Contract Times
Substantial Completion:
g 2 6 018 5.0 0 Ready for final payment:
days or dates
Net changes from previous Change Orders No.�to No.�- Net change from previous Change Orders No._to No._
g -10197.00
days
Contrac[Price prior to this Change Order Contract Times prior to this Change Order
Substantial Completion:
g 2 4 9 9 8 8.0 0 Ready for final payment:
days or dates
Net�(decrease)of this Change Order " Net Increase(decrease)of this Change Order
g 61304 44
days
Contract Price with all approved Change Orders Contract Times with all approved Change Orders
Substantial Completion:
g 18 8 6 8 3.5 6 Ready for final payment:
d•rys or dates
RECOMMENDED: APPROVED: ACCEPTE : � �
y; , B B '-L
B Engineer(Authorized Signature) y� Owner(Authorized Signaiure) Y� Contractor(Autho ed nature)
Date: �a I3 I 9� Date: Date: /� `Qv J�/ —
EJCDC No. ]9]0-8-B (1990 Edition)
Prepared by the Engineers Joint Contract Documents Committee and endorsed by The Associated General Contractors of America.