HomeMy WebLinkAboutResolution 95-1999 . . i� _ RESOLUTION NO. 95-99 RESOLUTION AUTHORIZING FINAL CHANGE ORDER(CCO#1 FINAL)FOR SIDEWALK REPAIR PROJECT 99-01 SWR(B &B CONSTRUCTIOI� BE IT RESOLVED by the City Council that the following change order be allowed for Sidewalk Repair Project 99-01 SWR. Construction Change Order Number 1 Final Adjust estimated quantities as"as build" for a total decrease of$25,164.25. Passed and approved this 8th day of November, 1999. �� � Mayor ATTEST: ���a. "� ���.� ..p. � 1�83 ;j :\ ,;� �''�<... City Clerk = 99-01 CURB&GUTTER&SIDEWALK PROJECT CHANGE ORDER#1 (FINAL): 2 NOV 99 B&B CONCREfE B&B TOTAL FINAL TOTAL CHANGE ITEM WORK OR MATERIAL UNITS PLAN UNIT PLAN INSTALLED FINAL ORDER NO. QUANTITY PRICE COST QUANTITY COST COST , 1. REMOVE 4" P.C.C. SQ.FT. 5000 1.05 5250.00 3217.55 3378.43 -1871.57 I, 2. REMOVE CURB&GUTTER LIN.FT. 1000 5.00 5000.00 831.10 4155.50 -844.50 3. REMOVE 6" P.C.C. SIDEWALK SQ.FT. 300 1.40 420.00 233.04 326.26 -93.74 4. REMOVE 6" P.C.C.VALLEY GUTfER&FILLET SQ.FT. 500 1.40 700.00 427.40 598.36 -101.64 I 5. INSTALL 4" P.C.C. SIDEWALK SQ.FT. 5000 2.50 12500.00 4122.64 10306.60 -2193.40 6. INSTALL 6" REINFORCED P.C.C. SQ.FT. 200 3.00 600.00 64.34 193.02 -406.98 7. INSTALL 6" P.C.C. SIDEWALK&APPROACH SQ.FT. 2000 3.00 6000.00 1306.26 3918.78 -2081.22 8. INSTALL CURB&GUTTER LIN.FT. 2000 14.00 28000.00 820.60 11488.40 -16511.60 9. INSTALL 8" P.C.C. VALLEY GUTfER&FILLET SQ.FT. 1000 4.00 4000.00 465.77 1863.08 -2136.92 10. ADJUST WATER CURB STOP EACH 5 75.00 375.00 0.00 0.00 -375.00 il. CONCRETE SAWING LIN.FT. 500 4.00 2000.00 258.90 1035.60 -964.40 12. REMOVE ASPHALT CONCRETE PAVEMENT SQ.FT. 1000 0.50 500.00 805.13 402.57 -97.44 SUBTOTAL: $65,345.00 $37,666.59 -27678.41 DCfRA ITEMS: LABOR/SAWING ON SIOUX FALLS INLETS LUMP 0 478.00 0.00 1.00 478.00 478.00 REMOVE 7" P.C.C. PAVEMENT SQ.Ff. 0 1.60 0.00 363.60 581.76 581.76 INSTALL 7" P.C.C. PAVEMENT SQ.FT. 0 4.00 0.00 363.60 1,454.40 1454.40 TOTAL EXTRA ITEMS $0.00 $2,514.16 $2,514.16 ' CHANGE ORDER#1 (FINAL) $65,345.00 $40,180.75 -$25,164.25 � : CHANGE ORDER (Instructions on reverse side) No. 1 PROJECT ...........99-01SWR................. DATE OF ISSUANCE ....... 11/3�99,,....,,,,. EFFECfIVE DATE .....�.�./.�/.9.�.......................... OWNER .... CitX of Brookin�s................................................................................ OWNER's Contract No. .................................... CONTRACTOR ....$..&..$..�Az�C.����..... ENGINEER .....Cit�..Fangine.:er...................... You are directed to make the following changes in the Contract Documents. Description: Decrease of $25,164.25 to final out the project Reason for Change Order: Adjust estimated quantities to As—Built Quantities Attachments: (List documents supporting change) CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES: Original Contract Price Original Contract Times Substantial Completion: OCtObeY' 1� 1999 g 6 5,3 4 5.0 0 Ready for final payment: days or dales Net changes from previous Change Orders No.�to No.1 Net change from previous Change Orders No.Q to No.� $ � ��� Contract Price prior to this Change Order Contract Times prior to this Change Order Substantial Completion: OCtober 1, 1999 $ 6 5,3 4 5.�� Ready for final payment: days or datcs Net�decrease)of this Change Order Net Increase(�s�3�)of this Change Order g 25�164.25 �5 wOrTcing a�Y� Contract Price with all approved Change Orders Contract Times with all approved Change Orders Substantial Completion: n�tnhPr 77� 1 999 $ 4 0,18 0. 7 5 Ready for final payment: d•rys or dates RECO NDED: APPROVED: ACCEPTED: B � _ B B''��%�6 �J!� �G/'Y'.�c�,—'�i, Y� ' En in er(Autho ed S' aWre) Y. Owntr IAuthorized Signa�ure) y� Con lor(Au � �J Signawre) Date: / ! " 3" 7/ Date: Date: ���/9�1 EJCDC No. 191(�-8-B (1990 Edition) Prepared by the Engineers Join[Contnc[Documents Committee and endorsed by The Associated General Contractors of America.