Loading...
HomeMy WebLinkAboutResolution 83-1999 . I RESOLUTION NO. 83-99 RESOLUTION APPROVING CHANGE ORDERNO. 1 (CCO#1)FOR THE "LANDFILL MACHINE SHED FINISH" � � BE IT RE50LVED by the City Council that the following Change Order#1 be allowed for the"Landfill Machine Shed Finish" Construction Change Order Number 1 (CCO#1) 1) Install angle iron on edge of concrete Add:.........................................................$175.00 2) Install styrofoam strips between concrete in main building and lean to Add:.........................................................$119.70 3) Concrete approaches to doors Add:................................................�---..$1,417.00 4)Excise Tax Add:...........................................................$3423 Add to Contract: $1,745.93 Passed and approved on the 13�'day of September, 1999. Mayor ATTEST: � �t�`�,'Q��L�". ;' `' ��� �^R.9 �°r � � ���. e,cr\1� City Administrator . ` I I ' CITY OF BROOKINGS Solid Waste Department City Hall • P.O. Box 270 Brookings, S.D. 57006 Phone(605)693-3667 September 8, 1999 Brookings City Council City Hall Brookinge, SD 57006 Dear Mayor & City Council: � BACKGROUND The "Landfill Machine Shed Finish" is a construction pro�ect to install concrete floors, insulation and metal interior with radiant heat in the main portion of a pole building and install concrete floors and doors on the lean to. The pole building is 50 feet wide and 90 feet long with a 24 feet by 90 feet lean to. The purpose of the building is to provide housing and a place to do maintenance and repair on the heavy equipment that is used to operate the landfill. The construction project is being done to move our alternate cover machine and supplies to the machine shed, thereby providing space in our main building (heated) for the automated garbage truck(s) . The alternate cover machine uses water with shredded paper and adhesives mixed together to spray on the garbage to cover it during the week (dirt is used on Saturdays) . Bids to finish the machine shed were taken on July 27, 1999 and a contract was awarded to euality Concrete of Dell Rapids, South Dakota. The bid amount was 5 69, 939. 00. The funds for this project come from the Solid Waste Funds. ,. � CHAHGE ORDER 1. The main bay in the pole building hae eteel rails imbedded in the concrete that protrude about 1/8 of an inch above the concrete. The purpose of the rails is to help protect the concrete from the tracks of our loaders and the steel wheels of our compactor. The contractor suggested putting in a heavy piece of angle iron across the edge of the inside concrete by the main door. The suggestion was a good idea and a decision was made to include the angle iron at a cost of S 175. 00. 2. The main pole building will be heated but not the lean to. As a result the contractor suggested putting styrofoam insulation strips between concrete in the heated portion and non heated portion in the lean to so heat is not transferred. His thinking was that a sharp temperature contrast in the lean to might promote cracking. A decision was made to add the styrofoam strips at a price of $ 119. 70. 3. The main building has 3 doors. The main door is 16 feet wide and the other two doors are 12 feet wide. When the contractors were pouring the concrete I decided we should have concrete approaches leading to the doors. I asked the contractor to put a 12 foot approach on front of the main door and 5 foot approaches in front of the small doors. The cost of the approaches was S 1, 417. 00 4. The contractors exise tax for the above changes was S 34. 23. Therefore, the total of change order #1 is an additional S 1, 745. 93. All field decisions were made by me. I respectfully request your approval of this change order. Sincerely, ��� � �G�� Robert B. McGrath Director of Solid Waste Management .,,� ::: i � � . a��f1J�, � . ' CHANGE ORDER . ' � • "'� r' (Inswctions on reverse side) No, #1 � �� • . .:�� . . _......... PROJECT .,LANDFILL„MACHINE„SHED FINISH .... . .. c:r :, DATE OF ISSUANCE ..8�20�99................ EFFECTIVE DATE ...$/.�4/.99............ �..::.:::... , ',}�:;.�, , .. �., •�-R . . ��z&.`;... OWNER .C ITY„OF,BROOK.��`IG�.��NI��:��iT,r..................................................... ` ..... .. . =•�� , . _• ; . . OWNER's Contract No. ��'� si; CONTRAC'TORQUAL��X..CANCRETE....... ENGINEER �.��X........................................... . . ; : r. You are directed to make the following changes in the Contract Documents. ' Description: Reason for Change Order: SEE ATTACHMENT A . Attachments: (List documents supporting change) . CHANGE IN CONTRACT PRICE: . CHANGE IN CONTRACT TIMES: Ori�nal Contract Price Original Contract Times Substantial Completion: NOV. 1 , 1999 S 6 9 . 9 3 9 .0 0 _ Ready for final payment: daya o�dun Net changes from previous Change Orders No._to No._ Net change from previous Change Orders No._to No._ 0 S � �ys - Contract Price prior to this Change Order Contract Times prior to this Change Orde� 6 9, 9 3 9 .�0 Substantial Cumpletion: N(1 V 1 ' 1 A q q S Ready for final payment: days or dues Net Incrcase(e}�gtgg�{of this Change Order Net Incrcase(decrease)of this Change Order S 1 , 7 4 5 .9 3 � ��Ys - Cuntract Price with all approved Change Orders Cuntract Times with all approved Change Orders Substantial Completion: I�10V 1 . 1999 S 71 , 6 8 4.9 3 Ready for final payment: ��y�«�« RECOMMENDED: APPROVED: ACCEPT : g �M� ✓• �C� 1 By: Y� OwnerlAuU+onznlSipuw�el �i By. CumrxlwlAuiAonzedSipWurcl En�neer Uu�honzeJ Signa�ure) Date: Date• � r � �� ( J Date• �/ / ��� EJCDC No. 1910-8-B (1990 Edition) Prepared by the Engineers Joint Contract Documents Committee and endorsed by The Associated General Contractors of America. . .j. , .siM�^�R ..y.,.... ..� r« ,:,'� � ....:.,..'...:�:'..�il'•:. . y;: a '� a�.�: . �%;:r' . Attachment A • Change Order•1 �� -Landfill�-Msahia�- ShQd•Fiaieh 1. Provide and install angle iron on outside edge of concrete on main door uesd for track equipment. Coat: S 175. 00 2. Provide and install styrofoam strips betreen concrete in heated portion of building and concrete lean portion. Cost: S 119. 70 3. Provide concrete approachea to main doors on machine shed. Cost: S 1, 417. 00 � 4. 2% excise tax for above items 8 34.23 Total Change order �1 S 1, 745. 93