Loading...
HomeMy WebLinkAboutResolution 82-1999 RESOLUTION NO. 82-99 RESOLUTION APPROVING CHANGE ORDER NO. 1 (CCO #1) FOR THE FINISHING LABORATORY SPACE FOR T. J. MICROMIX CONSTRUCTION PROJECT BE IT RESOLVED by the City Commission that the following change order be allowed for the T. J. Micromix Construction Project: Construction Change OrderNumber 1 (CCO #1) Mills Construction is directed to make the following changes in this contract: Item#1 Change From High Pressure Laminate Cabinets To Commercial Quality Deduct:............................................($4,620.00) Item#2 Increased Electrical Cost For Adding Three 220 Volt 3 Phase Outlets& Two Phone/fax Lines. This Increased Cost Includes Deducts For Cooler Electrical. Add:......................................................$871.00 TOTAL ($3,749.00) Passed and approved on the 7`�day of September, 1999. Mayor �4 _ . � - ' �"��"'''•'�c; ��,�;��;uiwiFp u :�' ' ;. c:,;'•� r �s �1� � •�`1 0 �Yi'gsS C�•S C—_..._--- -- --� Finance Officer � CHANGE Milis Construction, Inc. ORDER Brookings, SD 57006 PROJECT: LAB. SPACE (JOHNSON) CO NUMBER: 1 OWNER NAME: CITY OF BROOKINGS OWNER ADDRESS: CITY HALL, PO BOX 270 INITIATION DATE: 8/24/99 BROOKINGS, SD 57006 PROJECT NUMBER: 1483-1 CONTRACT DATE: 7/16/99 MILLS CONSTRUCTION IS DIRECTED TO MAKE THE FOLLOWING CHANGES IN THIS CONTRACT: Item # 1 Change From High Pressure Laminate DEDUCT ($4,620.00) Cabinets To Commercial �uality (See Item 1 Of Letter Dated 7/01/99 From Scott Lardy Attached) Item #2 Increased Electrical Cost For Adding ADD $871.00 Three 220 Volt 3 Phase Outlets &Two Phone/fax Lines. This Increased Cost Includes Deducts For Cooler Elect. TOTAL ($3,749.00) NOT VALID UNTIL S�GNED BY THE OWNER OR OWNER'S REPRESENTATIVE. Work on this change order may be proceeding based on verbal authoriry. Owner's review and signature is needed to maintain corrtract documentation and to show flnal agreement with the change. THE ORIGINAL CONTRACT SUM WAS------------------------------------------------------------------ 88,992 NET CHANGE BY PREVIOUSLY AUTHORIZED CHANGE ORDERS---------------------------• 0 THE CONTRACT SUM PRIOR TO THIS CHANGE WAS--------------------------------------------• 88,992 THE CONTRACT SUM WILL BE DECREASED BY THIS CHANGE ORDER-------------------------------------------------------------------------- -3,749 THE NEW CONTRACT SUM INCLUDING THIS CHANGE ORDER WILL BE------------------ $85,243 THE CONTRACT TIME WILL BE INCREASED BY 0 DAY DATE OF SUBSTANTIAL COMPLETION AS OF THE DATE OF THIS CHANGE ORDER IS 10/04/99 AUTHORIZED: �� �9 OWNER OR OWNER'S REPRESENTATIVE DATE MILLS CON TRUCTION D E co#1forJohnson.XLS 8/24/99 � Mills Construction, Inc. �a1�9 1311 Main Avenue South, Brookings, SD 57006-3842 • Telephone 605-6973100 • FAX 605-6973131 July 1, 1999 Gregg Jongeling City Engineer 31 l 3rd Ave. Brookings, SD 67006 RE: Brookings Area MultiPlex Lab Tenant Renovation—Johnson cost savings Our bid includes a high pressure laminate cabinet(same as what Kahler has in his labs), commercial quality with faceless frames (doors attach directly to the cabinet boxes with no frame stiles or hi.ndrances to the opening size). Here are the cost savings for cabinets if you elect to make the following changes: 1) commercial quality cabinets with the same construction as above except that in lieu of the high pressure laminate,we will use a"thermofused"type of laminate. One step below the high pressure laminate,but should work very adequately in this lab. r f�cc�7�d Deduct $ 4,620.00 2) another option is to use more of a residential style cabinet with a laminated door, and face of cabinet will Have a frame. These cabinets � have a nice smooth and clean door front(Johnson's main concern was that the doors be easy to clean and be flush). Deduct $ 8,250.00 , Please let me know if I can be of further assistance. Sincerely, Mills Construction,Inc. � � Scott Lazdy Project Manager SLL:sI A�C„ v �' CHANGE Mil�s Construction, inc. ORDER Brookings, SD 57006 PROJECT: LAB. SPACE (JOHNSON) CO NUMBER: 1 I OWNER NAME: GTY OF BROOKINGS OWNER ADDRESS: CITY HALL, PO BOX 270 INITIATION DATE: 8/24/99 BROOKINGS, SD 57006 PROJECT NUMBER: 1483-1 CONTRACT DATE: 7/16/99 MILLS CONSTRUCTION IS DIRECTED TO MAKE THE FOLLOWING CHANGES IN THIS CONTRACT: Item # 1 Change From High Pressure Laminate DEDUCT ($4,620.00) Cabinets To Commercial Quality (See Item 1 Of Letter Dated 7/01/99 From Scott Lardy Attached) Item #2 Increased Electrical Cost For Adding ADD $871.00 Three 220 Volt 3 Phase Outlets &Two Phone/fax Lines. This Increased Cost Includes Deducts For Cooler Elect. TOTAL ($3,749.00) NOT VALID UNTIL SIGNED BY THE OWNER OR OWNER'S REPRESENTATIVE. Work on this change order may be proceeding based on verbal authority. Owner's review and signature is needed to maintain contract documentation and to show final agreement with the change. THE ORIGINAL CONTRACT SUM WAS------------------------------------------------------------------ 88,992 NET CHANGE BY PREVIOUSLY AUTHORIZED CHANGE ORDERS---------------------------• p THE CONTRACT SUM PRIOR TO THIS CHANGE WAS--------------------------=-----------------. gg�992 THE CONTRACT SUM WILL BE DECREASED BY THIS CHANGE ORDER-------------------------------------------------------------------------- -3,749 THE NEW CONTRACT SUM INCLUDING THIS CHANGE ORDER WILL BE------------------ $85,243 THE CONTRACT TIME WILL BE INCREASED BY 0 DAY DATE OF SUBSTANTIAL COMPLETION AS OF THE DATE OF THIS CHANGE ORDER IS 10/04/99 AU ORIZED: � -�-�� �� �9 OWNER WNE RE ESEN ATIVE DATE MILLS CON TRUCTION D E co#1forJohnson.XLS 8/24/99