Loading...
HomeMy WebLinkAboutResolution 63-1999 r ''� RESOLUTION NO. 63-99 RESOLUTION RESCINDING RESOLUTION 62-99 WHICH APPROVED CHANGE ORDER (CCO#32)FOR TI� BROOKINGS MULTIPLEX CONSTRUCTION PROJECT Passed and signed on 13th day of July, 1999. ��,``°`v"','.cs Mayor I ��9�'�' .� M��B.� ,:Y 5�: .:a� o , ,S Finance Officer ., . ,► � RESOLUTION N0. 62-99 RESOLUTION APPROVING CHANGE ORDER(CCO#32)FOR THE BROOKINGS MULTIPLEX CONSTRUCTION PROJECT BE IT RESOLVED by the City Commission that the following change order be allowed for the Brookings MultiPlex Construction Project: Construction Change Order Number 32 Furnish and install or delete the following items in the Exhibition and County Building Phase 1&1B: 1. Delete labor and materials for"Induxtrex" Patterned Glass in the frame types `7J' & `HH' on the south wall of the Exhibition Building Deduct:......................................................... .-$5,656.00 Phase la 2. Delete toilet paper holders from remaining Bathrooms. Deduct:..............................................................-304.00 Phase 1 a 3. Add V.C.T. flooring in Storage Room#143. Add:..................................................................$368.00 Phase lb 4. Add variable speed controls and mechanical louvers on Arena exhaust fans. Add:..............................................................$10,681.00 Phase 1 a 5. Delete Concrete floor in the Arena. Delete:............................................................-$68,075.00 Phase la 6. Electrical revisions per descriptions for Sheet RE1.9. Add:..................................................................$575.00 Phase 1 a 7. Delete wall on Mezzanine to hide duct work. Deduct:.............................................................-$4,379.00 Phase la 8. Delete type 30 fluorescent fixtures from the Arena. Deduct:............................................................ -$3,030.00 Phase la 9. Delete south driveway from the south parking lot. Deduct:............................................................-$1,969.00 Phase la 10. Add burnished block masonry wall around the sprinkler piping in the Concourse. Add:..................................................................$437.00 Phase 1 a 11. Delete window NN and modify cabinet for sink. Add:..................................................................$522.00 Phase la Contract will be decreased by $70,830.00. No change in the completion date will be included. Passed and signed on 6th day of July, 1999. , . i �lf' � i,f. .� Mayor �� � MpR.9 �� �9 1� 'o� -�- C6. .�' .� � Finance Officer