HomeMy WebLinkAboutResolution 63-1999 r
''� RESOLUTION NO. 63-99
RESOLUTION RESCINDING RESOLUTION 62-99 WHICH APPROVED CHANGE ORDER
(CCO#32)FOR TI� BROOKINGS MULTIPLEX CONSTRUCTION PROJECT
Passed and signed on 13th day of July, 1999.
��,``°`v"','.cs Mayor I
��9�'�' .�
M��B.� ,:Y
5�: .:a�
o ,
,S
Finance Officer
., .
,► � RESOLUTION N0. 62-99
RESOLUTION APPROVING CHANGE ORDER(CCO#32)FOR THE
BROOKINGS MULTIPLEX CONSTRUCTION PROJECT
BE IT RESOLVED by the City Commission that the following change order be allowed
for the Brookings MultiPlex Construction Project:
Construction Change Order Number 32
Furnish and install or delete the following items in the Exhibition and County Building
Phase 1&1B:
1. Delete labor and materials for"Induxtrex" Patterned Glass in the frame types `7J' &
`HH' on the south wall of the Exhibition Building
Deduct:......................................................... .-$5,656.00 Phase la
2. Delete toilet paper holders from remaining Bathrooms.
Deduct:..............................................................-304.00 Phase 1 a
3. Add V.C.T. flooring in Storage Room#143.
Add:..................................................................$368.00 Phase lb
4. Add variable speed controls and mechanical louvers on Arena exhaust fans.
Add:..............................................................$10,681.00 Phase 1 a
5. Delete Concrete floor in the Arena.
Delete:............................................................-$68,075.00 Phase la
6. Electrical revisions per descriptions for Sheet RE1.9.
Add:..................................................................$575.00 Phase 1 a
7. Delete wall on Mezzanine to hide duct work.
Deduct:.............................................................-$4,379.00 Phase la
8. Delete type 30 fluorescent fixtures from the Arena.
Deduct:............................................................ -$3,030.00 Phase la
9. Delete south driveway from the south parking lot.
Deduct:............................................................-$1,969.00 Phase la
10. Add burnished block masonry wall around the sprinkler piping in the Concourse.
Add:..................................................................$437.00 Phase 1 a
11. Delete window NN and modify cabinet for sink.
Add:..................................................................$522.00 Phase la
Contract will be decreased by $70,830.00. No change in the completion date will be
included.
Passed and signed on 6th day of July, 1999.
,