Loading...
HomeMy WebLinkAboutResolution 58-1999 RESOLUTION NO. 58-99 RESOLUTION APPROVING CHANGE ORDER(CCO#4)FOR TI� BROOKINGS LIBRARY PROJECT BE IT RESOLVED by the City Commission that the following change order be allowed for the Brookings Library Project: Construction Change Order Number 4 1. Remove an additional 11 feet of sidewalk in front, and the existing sidewalk is 5'4" in lieu of 5'0" Add:...............................................$3 3 5.00 2. Enlarge mechanical opening thru floor Add:...............................................$297.00 3. Score e�sting cmu block at north wall Add:...............................................$284.09 4. Additional floor prep material required at existing restrooms Add:...............................................$613.97 5. Change drop box openings Add:...............................................$207.00 6. Change toilet paper dispensers Add:...............................................$102.00 7. Change sidewalk elevation at driveway Add:...............................................$991.20 8. Steeler door hardware and installation Add:...............................................$1,116.06 Subtotal:...............................................$3,946.32 O&P 15%:...............................................167.40 ExciseT�:.................................................84.28 TOTAL:...............................................$4,198.00 Passed and signed on 22°d day of June, 199 . , �+�F 6ROp� '/� ���;� �^r Mayor ��T : � � s - Fin fficer . 9„ , . � PROPOSAL owrvER ❑ REQU EST ARCHITECT ❑ AlA DOCUMENT G709 CONTRACTOR ❑ � FIELD a - - OTHER . PROJECT: PROPOSAL REQUEST NO: 3-3 Brookings Public Lib�ary Addition and Remodel DATE: 5111199 Brookings, South Dakota 57006 OWNER: ARCHITECT'S PROJECT NO: 7801-04 Library Board of Directors � . T�� CONTRACT FOR: Construction Waltz Const�uction Company.. P.O.Box 327 - 1141 st Street� South CONTRACT DATED: Feb�uary 12, 1998 Brookings, SD. 57006 • Please submit an itemized quotation for changes in the Contract Sum and/or Time incidental to proposed modifications to lhe Contract Documents described herein. _ ._ - THIS IS NOT A CHANGE ORDER NOR A DIRECTION TO PROCEED WITH THE WORK DESCRIBED HEREIN. DESCRIPTION: (writtendescriptio�ot�hework) Refer to Plan sheet 3.2 and provide the following corrective work to the existing exit door, located near the Northeast corner of the building: 1. Remove existing door and hardware; the existing hollow metal frame and electric dead bolt shalf be left in place to receive new hollow metal door and new hardware. 2. Coordinate door dimensions and hardware locations with the existing frame opening. 3. Provide hinges,tt�resliold, weatherstripping as specified; refer to Hardware Schedule No. 1, Section 08710. Provide Sargent Exit Device 12-8810, LCN Closer 4041-CUSH and Reese Bottom Sweep 362A. Coordinate new hardware with new hollow metal door. p ��t . 1 ,�,�,, � f . • =i .. 5/21/99 , . . ... .. . Steeler poor & Hardware ............................................ $ 1,008.06 Installation 6mhrs Ca� 18 00 ................. 108.00 Subtota) • 1,116.06 O&P 150�6 167.40 Excise Tax 26•54 TOTAL $ 1,310.00 . .� . •o/ WALT2 CONSTRUCTION INC. r � ,.� � l GENERAL CONTRACTORS :�.� d ;�,=; � � P.O. Drawer 327 • Brookings, South Dakota 57006 � • � Tclephonc 1605) 692•2241 Fax (605) 692-7041 . . May 17, 1999 CHANGE ORDER REQUEST 1) Remove an additional 11 feet of sidewalk in front, and the existing sidewalk is 5'4"in lieu of 5'0" . 114 sf removai (c�0.75 ................:....................................... add 85.00 ' 114 sf sidewalk �2.20 .........:..............................................add 250.00 _ 2) Eniarge mechanical opening thru floor• • 18 mhs � 16.50 .................................................................. add 297.00 3)Score existing cmu block at north wall � - �. � diamond blade .......................:........................................... add 119.09 10 mhrs � 16.50 .................................................:............. add 165.00 4)Additional floor prep tnaterial required at existing restrooms 1200 Ibs (�0.49 ................................................................. add 588.00 primer .................................................................................. add 25.97 5) Change drop box openings ' 8 mhrs � 16.50 ................................................................. add 132.00 RuppMasonry .................................................................... add 75.00 6) Change toilet paper dispensers cost of new dispensers ....................................:.................. add 152.50 credit on specified dispensers ....................................... deduct . 100.00 ' ��r ; change backing in walls/3mhs � 16.50 .......................... add 49.50 �`� ' � � _� . 7)Change sidewalk elevation at driveway � � � �� � �� remove sidewalk/336 sf c� 0.75 ....................................... add 252.00 � new sidewalk/336 sf�2.20 ............................................ add 739.20 � Subtotal ................................................................................. add 2,830.26 ExciseTax ............................................................................. add 57.74 TOTAL .................................................................................. add 2,888.00