HomeMy WebLinkAboutResolution 15-1999 RESOLUTION NO. 15-99
RESOLUTION APPROVING CHANGE ORDER(CCO#2) FOR THE
BROOKINGS LIBRARY PROJECT
BE IT RESOLVED by the City Commission that the following change order be allowed
for the Brookings Library Project:
Construction Change Order Number 2
1. Bring the new 4"water line from 5' outside the building into the existing
mechanical room.
Add:...............................................$1,122.00
2. A/E request 2-1, new sidewalks and site revisions per drawing.
Add:...............................................$4,8 84.00
3. Casework revisions
Add:...............................................$714.00
Total Add:........................................$6,720.00
Passed and signed on 2"d day of March, 1999.
�, �
Mayor
ATTEST:
�e;�o�.:
ro `,;r
V���\���RPOkqjFo.l'�iP
MA
os 1 3 ?�
�:,�o
i�..� � .••QQ�
�
Finance Officer
.CJ�:/ 11� 1777 1`/:C:J OUJ-O:r- U'+� �:��'+��� -�-� �'. "`� •�" • ^v�- --
�
Y `�'�LT7, CC��STRUCTIOZT I�IC.
� GLNCRAL COI�TRACTOR5
�, ! �
r •� � � P.O. Drawer ?Z7 • Brookings. South Dakota 57006
. � � .
•`, ' 'f�k�y.�n,tie �FU�I 69?•�:.�! }�ax (6U�) 692-7041
68nner Assocfates, lnc.
409 22nd Ave. South
Brookings, S.O.
F�bruary 11, 1999
Re: Brookings Library Projec�t
CHANGE ORDER REQUEST (Revised)
kem 1 - B��g thc new 4'wate� tine frvm 5' outside the buftding into the e�tistinq
mechanical room .
�
Vr� Ahlers ._.........s1000.00
O&P 4 096 ............. 100.00
_Exc'tse�ax 22�00
Total Add ..........; '!�122.00
Item 2 -A/E request 2-1, new sidowalks end site revisioris per drawinq.
remove sidewalks and dispose of ....... 1520 sf�'�1.OQ = � 1520.00
new sidewalks ............................._._...... 1295 si�;2.20= 2849.p0
curb 8 gutter .......................................... 6 it�:12.00• 72.00
asphaK ...................................................5 sy �i9.00= 45.00
provide 2 pipe boflerds at transformer ....2 ea � 15Q = 300.Q0
�XCiSe hX , v , gg�
Totai Add ................... ...................................... ��s i 4,884 00
.................. .
note; this doe, not inctude additional black dirt for�ew elevatlons
Item 3 • Casew�ork revisians
Watertown Woodworks ................� 600.00
S�les tax ...........................................36.�0
Installation ......................................... I�I/C
C78�P 1096 ........................................ 64.00
Excise hax ........................._......._. 14 00