HomeMy WebLinkAboutResolution 70-2000 . a
" RESOLUTION NO. 70-00
RESOLUTION AUTHORIZING FINAL CHANGE ORDER(CCO#1 FINAL)FOR
SIDEWALK REPAIR PROJECT 00-01SWR SCHEDULE B (Valley Gutter Project)
BE IT RESOLVED by the City Council that the following change order be allowed for
Sidewalk Repair Project 00-01SWR Schedule B.
Construction Change Order Number 1 Final
Adjust estimated quantities as"as build" for a total decrease of$25.06.
Passed and approved this 10�' day of October, 2000.
- �
��ov eR� Mayor
� y�
0
a
y +�� ��
�s�Q� �o�,�
City Clerk
00-01STI CURB &GUTTER&SIDEWALK PROJECT
SCHEDULE B: 10' WIDE VALLEY GUTfER
FINAL CHANGE ORDER: SEPTEMBER 28, 2000
SMITH & SMITH
TOTAL FINAL TOTAL CHANGE
IfEM WORK OR MATERIAL UNITS PLAN BID BID INSTALLED FINAL ORDER
NO. QUANTITY PRICE COST QUANTITY COST COST
1. INSTALL 8" P.C.C. VALLEY GUTTER sq.ft. 6400.00 5.40 34560.00 6395.36 34534.94 -25.06
FINAL CHANGE ORDER AMOUNT: , . , . - .
,
a �
TO: City Manager Mike Williams
City Clerk Shari Dunn
FROM: Assistant City Engineer Jackie Lanning
DATE: October 3, 2000
RE: Final Change Order for 00-01SWR, Schedule B
Valley Gutter Project
Please find the attached worksheet for the above referenced change order. This project
consisted of the construction of two - ten foot wide valley gutters located at 11� Street,
just east of 16� Avenue and between Yorktown Drive and 15� Street South, east of
Medary Avenue South. These valley gutters were built to improve the City's drainage
ways with minimal maintenance required. The valley gutter at 11� Street is on SDSU
property and SDSU will be paying half of the cost, as required by Resolution No. 22-85.
The plan quantity is 6400 Square Feet with a total bid cost of $34560.00. However, we
have measured the final product with a total of 6395.36 Square Feet with an actual cost
of $34534.94. The change order amount is a reduction of $25.06, adjusting estimated
quantities to as-built quantities.
JAL:jal