HomeMy WebLinkAboutResolution 70-2000 . a " RESOLUTION NO. 70-00 RESOLUTION AUTHORIZING FINAL CHANGE ORDER(CCO#1 FINAL)FOR SIDEWALK REPAIR PROJECT 00-01SWR SCHEDULE B (Valley Gutter Project) BE IT RESOLVED by the City Council that the following change order be allowed for Sidewalk Repair Project 00-01SWR Schedule B. Construction Change Order Number 1 Final Adjust estimated quantities as"as build" for a total decrease of$25.06. Passed and approved this 10�' day of October, 2000. - � ��ov eR� Mayor � y� 0 a y +�� �� �s�Q� �o�,� City Clerk 00-01STI CURB &GUTTER&SIDEWALK PROJECT SCHEDULE B: 10' WIDE VALLEY GUTfER FINAL CHANGE ORDER: SEPTEMBER 28, 2000 SMITH & SMITH TOTAL FINAL TOTAL CHANGE IfEM WORK OR MATERIAL UNITS PLAN BID BID INSTALLED FINAL ORDER NO. QUANTITY PRICE COST QUANTITY COST COST 1. INSTALL 8" P.C.C. VALLEY GUTTER sq.ft. 6400.00 5.40 34560.00 6395.36 34534.94 -25.06 FINAL CHANGE ORDER AMOUNT: , . , . - . , a � TO: City Manager Mike Williams City Clerk Shari Dunn FROM: Assistant City Engineer Jackie Lanning DATE: October 3, 2000 RE: Final Change Order for 00-01SWR, Schedule B Valley Gutter Project Please find the attached worksheet for the above referenced change order. This project consisted of the construction of two - ten foot wide valley gutters located at 11� Street, just east of 16� Avenue and between Yorktown Drive and 15� Street South, east of Medary Avenue South. These valley gutters were built to improve the City's drainage ways with minimal maintenance required. The valley gutter at 11� Street is on SDSU property and SDSU will be paying half of the cost, as required by Resolution No. 22-85. The plan quantity is 6400 Square Feet with a total bid cost of $34560.00. However, we have measured the final product with a total of 6395.36 Square Feet with an actual cost of $34534.94. The change order amount is a reduction of $25.06, adjusting estimated quantities to as-built quantities. JAL:jal