HomeMy WebLinkAboutResolution 25-2000 .
RESOLUTION NO. 25-00
RUNWAY SAFETY AREA SURVEY AGREEMENT WITH BANNER ASSOCIATES, INC.
WHEREAS, FAA Order 5200.8 "Runway Safey Area Program" requires a survey of the
Runway Safety area at all federally funded airports.
AND WHEREAS, Banner Associates of Brookings, SD has prepared a proposal to
provide said services on an hourly basis with a not to exceed amount of$14,300.
NOW THEREFORE, BE IT RESOLVED that the City Manager be hereby authorized to
execute said agreement for the City of Brookings.
Passed and approved this 24�`day of April, 2000
� �
�oo�A���r o�,� Mayo
� �� :x
�0 �'Z
nQ
� �
rk
, . . - .��� � BANNER
�.
��
S�►�.�(
SCHEDULE OF LABOR RATES AND EXPENSES
J U LY. 1999
TECHNICIAN 1: STAFF ENGINEER:
Junior Drafter.......................................... $20.00/Hour Staff Engineer..................................................... $48.00/Hour
Junior Rodman/Chainman Senior Designer
Field Assistant Resident Engineer 1
Junior Typist Chief ConsUuction Observer
Land Surveyor
Sr.Design Architect
CADD Dept.Head
TECHNICIAN 2: PROJECT ENGINEER:
Senior Drafter......................................... $25.00/Hour Project Engineer.................................................. $55.00/Hour
Junior Instrument Person Architect
Rodman/Chainman Design Engineer
Field Technician Resident Engineer II
Clerical AssistanUTypist Senior Land Surveyor
SENIOR TECHNICIAN: PROJECT MANAGER:
Drafter/Designer..................................... $34.00/Hour Project Manager.................................................. 365.00/Hour
Party Chief Project Architect
Insbvment Person Senior Design Engineer
Senior Survey Assistant Resident Engineer III
Senior Field Technician Project Surveyor
Administrative AssistanUSecretary
Architect Intem
ENGINEER: DEPARTMENT HEAD:
Engineer in Training................................ $42.00Mour Senior Project Manager........................ $70.00 to$90.00/Hour
Designer Senior Engineer
Senior DrafteNDesigner Senior Architect
Senior Party Chief Senior Resident Engineer
Construc6on Observer
Jr.Design Architect OFFICE/DMSION MANAGER:
Professional Services Manager................ $90.00 to$110.00/Hour
Division Manager
Office Manager
REIMBURSABLE EXPENSES
1. Transportation at$0.30 per mile in addition to the above hourly rates.
2. Meals at State Rates.
3. Lodging at actual cost.
4. Reproduction:
Photocopy........................................................................................... $0.05/CoPY
BluelinePrinting.................................................................................. 0.12/Sq.Ft.
Mylar.................................................................................................... 0.60/S q.Ft.
Large Photocopies.............................................................................. 0.25/Sq.Ft.
MylarSepia......................................................................................... 0.70/Sq.Ft.
Black&White Digital Copies............................................................... 0.20/CoPY
ColorCopies........................................................................................ 0.40/CoPY
Large High Gloss Color Plots.............................................................. 2.00/Sq.Ft.
5. SubconVacts.............................................................................................. Cost Pius 10%
6. All other direct project expenses at actual cost of materials.
The above rates are firm through June 30, 2000
We reserve the right to adjust the rates annually,thereafter.
Revised July 1,1999
� BANNER
Sheet 2 of 2
April 11, 2000
Runway Safety Area Survey
Brookings Municipal Airport
If the above proposal is acceptable to you, please complete the
acknowledgment below and return one copy for our records and as authorization
to proceed. If you have any questions, please do not hesitate to contact our
office.
Sincerely
i�
Daryl Englund, PE, LS
Sr. Vice President
Enclosure
ACKNOWLEDGMENT OF ACCEPTANCE
Accepted this day of
For:
By:
Title:
, BANNER
� CON8ULTING ENCi1NEEF5 6 ARCNITECTS
BANNER ASSOCIATES,INC.
409 22nd Avenue South•P.O.Box 298
Brookings,South Dakota 57006-0298
(605)692•6342
FAX:(805)692-5714
April 11, 2000
Mr. Gregg E. Jongeling, P.E.-L.S.
City Engineer
City of Brookings
P.O. Box 270
Brookings, SD 57006
RE: Runway Safety Area Survey
Brookings Municipal Airport
Dear Mr. Jongeling:
In accordance with your request for Surveying Services, dated January 6,
2000, Banner is please to submit this letter agreement to provide the services as
requested. We originally assembled this letter agreement in January, 2000, but
just received approval from Wayne Nelson, SDDOT. Mr. Nelson advised that
these costs are eli ible for reimbursement on your e ai men
o�ec . r. e son in ica e i is impo an that the City retain this agreement
and invoices for the future reimbursement. The invoices are important since we
will be billing on an hourly rate.
These services will include submitting the deliverables as provided from
the Federal Aviation Administration (Runway Safety Area Survey Requirements
for Air Carrier Runways) and as attached to this agreement. We are proposing to
complete the work by June 15, 2000 in order to accommodate your submittal to
FAA by June 30, 2000.
We are prepared to complete the surveying services based upon direct
labor and expense costs per the attached "Schedule of Labor Rates and
Expenses", dated July, 1999. We have estimated the fee will not exceed
$14,300. Expenditures above the total estimated amount wi no e excee e
prior authorization by the City of Brookings.
U.S.Departrnent Federal Aviation Administration
, ' ofTransportotion Bismarck Airports District Office
Federal Aviation 2000 University Drive
Administration Bismarck,North Dakota 58504
December 27, 1999
Mr. Gregg Jongeling, City Engineer
Brookings Municipal Airport
307 Second Southwest
Brookings, SD 57006-1841
Runway Safety Area(RSA) Survey
Dear Mr. Jongeling:
On October 1, 1999, the FAA issued Order 5200.8 "Runway Safety Area Program", which
re uires the FAA to collect and maintain data on the RSA for each ru der 11
��e ai o . e ive o t is requirement is t a As at federally obligated
airportsran a�l RS��As at airports certificated under Federal Aviation Regulation(FAR)
Part 139, shall conform to the standards contained in AC 150/5300-13 "Airport Design",to the
extent practicable. Based on this RSA information, the FAA will make a determination of the
acceptability of the RSA and if enhancements are necessary for improved airport safety. For
all runways certificated under FAR Part 139 or that plan to be certificated within the next two
years, FAA must accomplish the determinations prior to June 30, 2001.
In support of this objective, we are requesting each certificated airport sponsor work with its
consultant to provide the necessary information for an analysis of the airport runways. It is
recommended, in the interest of fiscal responsibility, that all runwavs at certificated airports be
analyzed at this time, even though the FAA's June 30, 2001, deadline only applies to
certificated runways. We would re uest that ou have our surve results to our office b
June 30 2000 so that ey can e ana yze pnor to an on-srte inspection of these areas on
o . � e FAA determinatioii wiil be made irom the review of the data and the on-site
inspection.
All work associated with obtaining the RSA information and preparing the analysis will be an
eligible expense and reimbursement may be requested under the Airport Improvement
Program.
We have prepared a document entitled "Runway Safety Area(RSA) Survey Requirements For
Air Carrier Runways" (copy enclosed)to assist you and your consultant in conducting the
necessary survey work and in preparing the appropriate drawings. Two copies of the
completed analysis package should be submitted to our office. ,
If you have any questions please contact the Bismarck Airports District Office at
701-250-43 85.
Sincerely,
� ��`� ���
Irene R. Porter, Manager
Bismarck Airoorts District (�fficP
CITY OF
BROOKINGS
City Engineering Department
City Hall • P.O. Box 270
Brookings, S.D. 57006
Ph. (605) 692-6629
TO: City Manager Michael Williams
FROM: City Engineer Gregg E. Jongeling
DATE: April 18, 2000
RE: Runway Safety Area (RSA) Survey
According to the 12-27-99 letter from Irene Porter (copy attached), we are
required to have a Runway Safety Area (RSA) Survey to the FAA by June 30, 2000.
Banner, which does all our airport consulting work, has provided the attached proposal
to do the work with a not-to-exceed fee of $14,300. This agreement has been reviewed
by the State Aeronautics Department. We will be able to recoup 95% of the cost when
we do our next federally funded airport project. We hope to do a small project in 2001
that would expand our general aviation ramp to tie in with Big Sioux Aviation's
expansion. Banner's contract is by the hour. We will pay for only the time they put into
the project.
I would suggest that you put this agreement on the April 24�h agenda to get
authorization to proceed. Funding can come from 606625542509 Maintenance
Grounds/Runways which has $34,000 in it. If we run over at the end of the year, we just
budget to make it up in 2001.
GEJ:dms