Loading...
HomeMy WebLinkAboutResolution 15-099 Resolution 15-099 Resolution Awarding Snow Removal Equipment Contracts Whereas, the City of Brookings opened bids for Snow Removal Equipment on Tuesday, September 15, 2015 at 1:30 pm at Brookings City & County Government Center; and Whereas, the City of Brookings has received the following bids for Snow Removal Equipment: Three (3) Motorqraders with Winqs: Only two bids were received. VJ Ahlers Excavating Inc, Champion 730A, $150.00/hr; Bowes Construction, 140H, $165.00/hr. One (1) 3- to 6-Yard Loader: Winter Inc, JD624K, 3.5 cubic yards, $145.00/hr; VJ Ahlers, JD624, 3.5 cubic yards, $150.00/hr; Bowes Construction, 966 CAT, 5 cubic yards, $220.00/hr. Four (4) Loaders with Reversible Blades: Only three bids were received. Bowes Construction, 950 CAT, $185.00/hr; Concrete Contractors Inc, two WA250's, $185.00/hr each. Eiqht L8) End-Dump Trucks: V.J Ahlers Excavating Inc, #2, 25 cubic yards, $125.00/hr; Winter Inc, #28, 23.34 cubic yards, $120.00/hr; Prussman Contracting Inc, #19, 22.8 cubic yards, $125.00/hr; Prussman Contracting Inc, #20, 22.8 cubic yards, $125.00/hr; VJ Ahlers Excavating Inc, #5, 20 cubic yards, $110.00/hr; Bowes Construction, two trucks, 22.7 cubic yards each, $125.00/hr each; Prussman Contracting Inc, #22, 22.2 cubic yards, $125.00/hr; Prussman Contracting Inc, #21, 20.6 cubic yards, $125.00/hr; Prussman Contracting Inc, #23, 19.5 cubic yards, $125.00/hr. Now Therefore, Be It Resolved the following bids be accepted: Three (3) Motorqraders with Winqs: Only two bids were received. VJ Ahlers Excavating Inc, Champion 730A, $150.00/hr; Bowes Construction, 140H, $165.00/hr. One (1) 3- to 6-Yard Loader: Winter Inc, JD624K, 3.5 cubic yards, $145.00/hr. Four (4) Loaders with Reversible Blades: Only three bids were received. Bowes Construction, 950 CAT, $185.00/hr; Concrete Contractors Inc, two WA250's, $185.00/hr each. Eiqht (8) End-Dump Trucks: VJ Ahlers Excavating Inc, #2, 25 cubic yards, $125.00/hr; Winter Inc, #28, 23.34 cubic yards, $120.00/hr; Prussman Contracting Inc, #19, 22.8 cubic yards, $125.00/hr; Prussman Contracting Inc, #20, 22.8 cubic yards, $125.00/hr; VJ Ahlers Excavating Inc, #5, 20 cubic yards, $110.00/hr; Bowes Construction, finro trucks, 22.7 cubic yards each, $125.00/hr each; Prussman Contracting Inc, #22, 22.2 cubic yards, $125.00/hr. Passed and approved this 22"d day of September, 2015. CITY OF BROOKINGS CITy 1��� __ _ �. �o;�A ��N��F^°-;. Tim Reed, Mayor Nz' .�T� ' d'6'�'S • � nv,� :�� S�'•.. •'//������'/ I/ �/�/ r�oa hari Thornes, City Clerk