Loading...
HomeMy WebLinkAboutResolution 072-2014 Resolution No. 72-14 Resolution Authorizing Change Order No. 1 (CCO#1)for 2014-02STI, Main Avenue South and 26th Street South Assessment Project; Bowes Construction Inc. Be It Resolved by the City Council that the following change order be allowed for 2014-02STI, Main Avenue South and 26t"Street South Assessment Project: Construction Change Order Number 1: Schedule A: Adjust the contract for extra silt fence removal, a change in type of sanitary sewer pipe for the areas where the depths of sanitary sewer exceeded 20 feet (this witl be paid by BMU),the addition of crushed concrete material which was mixed with the utility trench material due to high moisture levels in the subgrade, removal of unsuitable soils and the use of additional engineered fill in the lift station area, additional signage for the detour,Taylor fireworks, and blinking lights at the temporary stop signs, and a deduct for a change in the curb and gutter from an 8 inch gutter section to a 6 inch gutter section for a total increase of $43,396.26 to the contract for Schedule A. Increase the contract completion date by ten working days. Passed and approved this 26t" day of August, 2014. CITY OF BROOKINGS . � Tim Reed, Mayor �a��ooae ona���i'�- (q i ~ � C� � T � � � . �M O • � 9�-�T hari Thornes, City Clerk